Callout 1 of 3
Where the covering stops at a seventeenth-century frame
The opening callout is the verge, the neat finish along a gable end where the covering projects past the wall. On a timber-framed house the verge can sit hard against the frame, which is why we begin there. In 1932 the Royal Commission on Historical Monuments published its inventory of Herefordshire. Where it gave no other detail, it described its entries for Canon Pyon parish as buildings that "are of the 17th century and of two storeys, timber-framed and with tiled or slate-covered roofs". That sentence describes a particular kind of roof, with tiles or slates laid over a structure that has been settling and drying for centuries.
Old frames move. The timbers dry, shrink and shift against the covering, and a gap opens between the two. We look along the face of the frame for daylight, for bedding that has fallen away from the verge, and for staining on the timber below it, which marks the track of rain down the wall. The remedy follows the house. Some verges are bedded on mortar with the end tiles overhanging the gable, and others are finished with dry-fix units held by screws; BS 8612 is the standard for dry-fix. Marley, the tile maker, states that "Installing to BS 5534 isn't required by law", yet mortar is no longer treated as enough to hold a covering on its own, so we fix mechanically as well and keep the bedded look where the building asks for it.
A loose verge by itself is a repair. For England the Planning Portal sets the test for a larger job: a re-roof does not normally call for an application while "Less than 25 per cent of the total 'building envelope'" is affected and "Less than 50 per cent of the roof is affected". Weight is a separate test. Any new covering that is 15 per cent or more heavier than the one it replaces needs Building Regulations approval and a structural check before tiles are ordered, and an old frame is exactly where that check earns its place.
Our roof repairs page covers the smaller jobs. In every case each gap at the frame is photographed and sent to you with its position measured from the nearest gable, so the spot can be found again by anyone who goes up to look. If the survey finds that a gable has been patched more than once, we show you the earlier patches beside the new fault and say plainly whether a larger repair would hold better.
The verge beside a timber frame
A verge that has parted from its frame is a repair first, and a re-roof only if the survey says so.