01432 610152 Get a quote Call 01432 610152

Roofers in Much Cowarne

Ridge, eaves and listed barn roofs for Much Cowarne, 9.4 road miles north-east of Hereford.

Our survey starts on the ridge, photographs each fault in order and ends with one written total price.

Get a free quoteCall 01432 610152

Three weak points on Much Cowarne roofs

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Long barn ridgesA barn ridge runs the full length, so there are many joints to fail.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Tired eaves and guttersA sagging gutter spills water onto the wall plate and the wall below.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Listed hop kiln and barnsProtected farm buildings need the right consent before any roof work starts.

Getting to Much Cowarne

Much Cowarne on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Much Cowarne, from barn ridge to listed frame

A Much Cowarne roof read from the long ridge down to the listed farm buildings

Our Much Cowarne survey keeps one order. We walk the ridge from gable to gable, drop to the eaves and the gutter line beneath it, and finish with the framed, listed barns that set the consent rules.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Ridge run; 2 Eaves line; 3 Listed farm roofs.

Fig. 1 The three Much Cowarne callouts, numbered on a sectioned farmhouse.

Callout 1 of 3

Long ridges on Much Cowarne barns and farmhouses

A Much Cowarne survey begins at the top. Barns and farmhouses are long buildings, so the ridge, the line at which the two main slopes meet, can be a long run of capping tiles with a great many joints to keep tight. The Royal Commission's 1932 survey of the county found timber-framed walls on the monuments it described in this parish, and roofs it called "covered with tiles or slates". Whatever covers the slopes of your own building, the capping along the top is set in a mortar bed or fixed by a dry-fix system, which uses clips and screws instead of mortar.

On the ladder we test the capping tile by tile, starting at the left-hand gable and finishing at the right. A capping tile that moves when pressed has lost its bed. Cracked mortar lets rain run into the top course of tiles, so the loft gets its own check, for a thin line of light at the apex and for staining on the ridge board. On a long barn roof we number the tiles from the left in our photographs, which lets you see where each fault sits without climbing up yourself.

Marley, the tile maker, says "Installing to BS 5534 isn't required by law", and that the 2015 amendments "made it clear that mortar could no longer be relied upon as the only means of securing the roof covering". Mortar is still used. The current British Standard for fixing slates and tiles is BS 5534:2014+A2:2018, and dry-fix ridge and verge kits fall under BS 8612. When we relay a ridge we add a mechanical fixing to every capping tile, and on an older farmhouse we keep a bedded finish where that suits the building.

Each covering has its own published life. For clay roof tiles the BRE set a minimum life expectancy of 60 years, Marley reports, and no other covering shares that figure. For concrete tiles Marley says "around 60 years", while HomeBuilding gives "40-50 years" for plain concrete tiles. Neither source makes a promise. Where the ridge has failed and the slopes are sound, relaying it is a repair, and a repair is how we price it. Our pitched roofing page explains what a full re-cover involves if the survey points that way, and why a tired ridge alone may not justify one.

Checked along a Much Cowarne ridge

  • Rocking capping tiles, numbered from the left gable
  • Cracked or missing bedding mortar
  • A mechanical fixing on every capping tile
  • Daylight or staining along the apex inside
  • The tile at each end of the run

Press a capping tile: if it moves, its bed has gone, and relaying the ridge is still only a repair.

Fig. 2 The ridge, drawn close

Callout 2 of 3

Eaves, gutters and the wall plate below them

Eaves is the name for the lower rim of a slope, where the roof overhangs the wall. A long farmhouse or barn roof sends a great deal of rainwater to that one line, so the gutter and the first courses of covering do heavy work. We look for a gutter bowed between its brackets, for joints that drip, and for dark streaking down the wall that shows where rain has been running over the lip for a long time. Water standing in a gutter after the rain has stopped is the quickest giveaway of all. On a long barn roof one blocked downpipe can overload a whole run, so we trace each downpipe down to its base.

Brett Martin, the guttering manufacturer, advises a slope of "1mm for every 600mm", so a run that has sunk out of true will hold water however clean it is kept. Behind the gutter come the fascia board, then the rafter ends, then the wall plate, the timber bedded on the wall head that carries the rafters. From the ladder we test the timber with a probe, and the loft side gets the same attention, because soft or darkened wood there tells us a leak has been working for a long while.

A retailer of uPVC fascia boards, an interested party, says they can typically perform for between 20 and 40 years. That seller profits from a sale, so we take the range as a guide only and test each board where it is fixed. A board that is sound but dirty is cleaned and refixed. A board that has split or warped is replaced with one that matches the rest of the run, so the roofline looks the same from the lane.

Eaves ventilation matters when the roof has a high resistance (HR) underlay, the sheet laid beneath the battens. In Marley's account, HR underlay does not pass vapour, so ventilation matters, and Marley sets out "25mm along the length of the eaves for pitches of 15° or less; 10mm along the length of the eaves for pitches of more than 15°". We check that loft insulation pushed into the eaves, or years of debris, has not closed that gap. Our guttering, soffits and fascias page covers a full roofline renewal once the boards are past saving.

Eaves parts on a Much Cowarne farm roof

Gutter
Falls to the outlet with dry joints
Fascia board
Sound timber or capping, fixed tight
Wall plate
Dry timber along the wall head
Rafter feet
Probed from the ladder, then seen from the loft
Eaves vent
A clear gap where the underlay calls for one
Fig. 3 Eaves and gutters, drawn close

Callout 3 of 3

Listed barns, a hop kiln and nearby conservation areas

The last stop is the framed and listed farm buildings. Barn and Hop Kiln Adjoining Red Witchend on West is listed Grade II (list entry 1276248, first listed 12 April 1973), and so is the Barn East of Red Witchend (list entry 1234198, first listed 12 April 1973). Red Witchend itself is Grade II (list entry 1234194). Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 calls for consent where works would affect "its character as a building of special architectural or historic interest". Permitted development rights stay with a listed building, yet a further consent is required, so the council's answer comes before a tile moves. A kiln roof is a different shape from a house roof, and we photograph its form, fixings and openings before we price anything. At a framed gable the covering stops against the timbers, so we check for slots between frame and tiles, for lost verge pointing, and for wet streaks on the posts. A repair in the materials the building was made with lets the patch move with the frame instead of working against it.

Old farm buildings can hold wildlife. Section 1 of the Wildlife and Countryside Act 1981 makes it an offence for a person intentionally to damage or destroy any nest that is still being built or has birds in it. All bat species have full legal protection, and GOV.UK lists "repairing or replacing a roof" among the work that can disturb them. Where a licence is possible, GOV.UK says "You may be able to get a licence from Natural England". If the loft shows droppings or a nest, we stop and tell you before anything else is touched.

Herefordshire Council's list shows conservation areas at Ocle Pychard and Stoke Lacy, close to the parish, and 64 across the county. Check your own address against that list, and check whether an Article 4 direction applies with Herefordshire Council. Where a roof window or dormer is wanted, start with our planning guide for roof windows before anything is drawn up.

Building control for a Much Cowarne address is Herefordshire Council Building Control, which the council runs itself, on 01432 261938 or at bce@herefordshire.gov.uk. A registered building control approver can act in its place. Our listed and heritage roofing page shows our approach to protected roofs, starting with the photographs and ending with the final lead dressing.

A gable on a framed farm building

SoundVerge snug against the framing, mortar whole
Needs workA gap beside the timber, loose verge mortar, damp staining

Much Cowarne barns, kilns and consents

What does a survey cover on a long Much Cowarne barn roof?

We walk the ridge from gable to gable, test each capping tile, and look along the verges, the valleys and the eaves. From inside the loft we check the underside for daylight, damp and disturbed battens. Every fault is photographed and numbered from one end of the roof, so the report reads like a plan. The written price follows once the survey shows what the roof needs, and one total covers everything.

Do roof works on a listed Much Cowarne barn need consent?

Two barns by Red Witchend are listed Grade II. Under section 7 of the 1990 Act, works affecting the special character of a building need listed building consent, and Herefordshire Council decides whether a particular job does. Ask the council before work starts. Listed buildings keep their permitted development rights, with a separate consent required too. Our photographs show the roof as found, which helps any application.

Does re-covering a Much Cowarne roof need Building Regulations approval?

Much Cowarne sits in England. A heavier new covering, 15 per cent or more over the old, brings approval, plus a structural check first. Otherwise the Planning Portal's two-part test decides: no application is ordinarily required for work touching under 25 per cent of the building envelope and under 50 per cent of the roof. Until 24 March 2027, AD L 2021 Table 4.3 sets the insulation figures for a renovated roof.

Will bats or nesting birds delay work on an old barn roof?

They can. Bats and their roosts are fully protected by law, and a nest is protected against intentional damage while birds use it or are still building it. If a licence is needed in England, it comes from Natural England. A loft check before stripping tells us what is there. If we find signs, we pause, tell you, and wait for the right advice before touching the covering. The survey notes the check.

Is my Much Cowarne house inside a conservation area?

Look your street up on Herefordshire Council's conservation area list, which is what decides. The council shows areas at Ocle Pychard and Stoke Lacy nearby, and 64 in the county overall. Ask the council whether an Article 4 direction applies to your house as well, since a direction may remove permitted development from a house. Get both answers before you accept a quote.

What does a scaffold on a Much Cowarne lane need?

Scaffold standing on the highway needs a licence, issued under section 169 of the Highways Act 1980. Herefordshire Council's licence costs £167 and it covers a maximum of one month only; an extension is £123 per month, and the council wants the form at least 10 days ahead. We arrange the licence with our scaffolder. The written total carries the scaffold cost as well. National Highways is responsible for trunk roads and motorways.

Ask for a Much Cowarne ridge-to-eaves survey

Photograph the roof from the ground, or write a line or two about it, and we will arrange a visit.

10-year workmanship guarantee, in writing