01432 610152 Get a quote Call 01432 610152

Roofers in Berrow

Berrow's roofs, from a twin-roofed manor house to listed barns and a Grade II* church.

We start at the valleys and the ridge, photograph every fault on the roof itself, and put one total price on paper.

Get a free quoteCall 01432 610152

What sits above Berrow's lanes

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Twin roofs and their valleyWhere two roofs meet side by side, one valley carries both slopes.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Listed barns in the parishA listed barn roof needs consent settled before any covering is lifted.
  • Newer homes with grey concrete tile roofs along a curving estate road
    A Grade II* village churchChurch roofs sit under a separate consent regime from ordinary houses.

Our map of Berrow

Berrow on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Berrow roofs, valley to church wall

From valley to church wall: what a Berrow survey reads, in order

We read a Berrow roof in the order we climb it: the valley where twin roofs meet, then the tiled slope of a listed barn, then the church wall and the rules that sit behind every repair.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Valley; 2 Barn slopes; 3 Church wall.

Fig. 1 Valley, barn slope and church wall, numbered on the border house in section.

Callout 1 of 3

The valley where twin tiled roofs meet

Our climb through Berrow starts at a junction that sits out of view from the lane: the valley. The Victoria County History of 1913 describes Hollybush Manor, on the Ledbury road at the western edge of the parish, as a red brick house of two storeys with twin tiled roofs. Two roofs sitting side by side leave a trough between their slopes, and that trough is a valley. It takes the run-off of both slopes and sends it down to the gutter, so it carries more water than any other single line on the house.

A valley is formed in sheet lead or with purpose-made valley tiles. Sheet lead is graded by code, and Royston Lead's table lists Codes 4, 5, 6, 7 and 8 for a pitched valley gutter, with Code 3 "Recommended for lead soakers only". A soaker is the small folded piece of lead that sits under each course of tiles beside a chimney or wall, so a sheet thin enough for a soaker is the wrong lead for a trough. When we lift an edge of the lining we identify the code before we say what the repair needs.

From a ladder, and again from inside the loft, we look for moss, leaves or a seeded weed holding water in the trough, lead that has cracked along a fold or lifted at a lap, and cut tiles along the valley edge that have slipped. We also look at the rafters below, because a stain on the timber shows a slow leak months before a ceiling does. If a trough overflows in a downpour, the water runs over its edge and onto the course of tiles beside it, so we check that course too, and the gutter it drains into.

A cracked fold or a slipped cut tile can be a repair and not a new valley, and the survey says which it is. Each fault is photographed on the roof itself, so the fault is plain to see before we say what we would do. A house with twin roofs can have more than one valley or abutment to read, and we walk each of them before the report is written. Our roof repairs service covers valley work, and lead roofing covers relining a trough in sheet lead.

Checked along a Berrow valley

  • Moss, leaves or weeds holding water in the trough
  • Lead cracked at a fold or lifted at a lap
  • Cut tiles at the valley edge that have slipped
  • Stains on the rafters beneath the valley
  • The course of tiles beside the trough

Two roofs side by side share one trough, and it carries the water of both.

Fig. 2 The valley, drawn close

Callout 2 of 3

Listed barns and what a tiled slope needs

The second callout is the slope of a barn roof. Among the parish's listed buildings are two barns. Church Barn is Grade II (list entry 1349209, first listed 3 December 1985), and Field Barn and Neither Barowe is Grade II as well (list entry 1098849, with the same listing date). A tiled slope on a barn like these is read differently from a house slope, because the listing protects the building's character and a covering is part of that character. Under section 7 of the 1990 Act on listed buildings and conservation areas, works that would alter "its character as a building of special architectural or historic interest" need listed building consent. So the question for Malvern Hills District Council comes before a single tile comes off.

Re-covering in the same material is where we begin. We lift a few tiles to see the battens (the thin timbers carrying each course), and the rafters behind them, and we photograph the underside. Marley publishes a minimum pitch for each tile in its range, and its clay tiles alone run from 15 degrees for the Lincoln pantile to 40 degrees for the Canterbury, so the angle of the slope limits what can go back on it. The report names the tile, the pitch and the fixings, so the council sees the same facts we do.

As for size, no application is normally needed in England if less than 25 per cent of the building envelope is affected and less than 50 per cent of the roof is affected, according to the Planning Portal's page on Building Regulations. Listing is a separate question from those limits, so both get asked. A covering heavier than the old one by 15 per cent or more calls for approval and a structural check first. Should new insulation go in at rafter level, AD L 2021 Table 4.3 sets 0.35 as the threshold and 0.16 as the improved figure, until AD L 2026 Table 3.3 takes over on 24 March 2027.

Old barn roofs can hold nests. Section 1 of the Wildlife and Countryside Act 1981 is breached by anyone who intentionally damages a wild bird's nest while birds occupy it or are still building it. On bats, GOV.UK calls every species fully protected, with their roosts, lists roof repair and replacement as activities that may affect them, and says a licence may be available from Natural England. Before a barn is stripped we look for nests and for droppings, and the work waits if we find either.

Before a barn roof is touched

Who decides whether a Berrow barn roof needs consent?

Malvern Hills District Council, as the local planning authority. Give it the list entry number, 1349209 for Church Barn or 1098849 for Field Barn and Neither Barowe, and describe the covering you have in mind before any tile is lifted.

Listing protects the building's character, and a covering is part of it.

Fig. 3 The slopes, drawn close

Callout 3 of 3

St Faith's wall, the council's lists and the licences

Callout three is a wall, and it belongs to the church. St Faith's is listed Grade II* (list entry 1098847, first listed 23 March 1968), in a parish of 334 usual residents at the 2021 Census, according to the ONS. Which route applies to roof work on a listed church turns on the denomination and on whether worship continues there. The Church of England's faculty system takes the place of council consent for its churches in use, and the Methodist Church, the United Reformed Church, the Roman Catholic Church and Baptist Union member churches whose trustee is a Schedule 1 trust corporation hold the same exemption from listed building consent for buildings in use. Unitarian and Quaker buildings are not covered, and neither is a chapel that has closed, so each of those needs listed building consent. Put the question to the church's governing body first, quoting the list entry.

Malvern Hills District Council publishes the conservation areas it has designated, so start with that council list to see whether your Berrow address is covered. The council states that no Article 4(2) Directions are currently in force in the district. Read the list before the roof's appearance from the lane changes. If you are weighing a roof window or a dormer, read our roof window planning guide first, which sets out how permitted development limits work in England and in Wales.

Building control for a Berrow address comes from South Worcestershire Building Control, in which Malvern Hills District Council, Worcester City Council and Wychavon District Council are partners. A registered building control approver is the private alternative. A scaffold that stands on a public road or footway falls under section 169 of the Highways Act 1980, and the licensing body in Berrow is Worcestershire County Council. The scaffold is part of the quoted total, with no separate figure to chase.

Our listed and heritage roofing page explains how we work on a protected building, from the first photograph to the last lead dressing.

Words you will meet in Berrow

List entry
The number that identifies a listed building in the national record
Valley gutter
The lined trough where two roof slopes meet
Soaker
A folded piece of lead slipped under tiles beside a wall
Building control approver
A registered private firm that can check building work instead of the council

Berrow roofs: valleys, barns and a church

What should I look for in the valley between two Berrow roofs?

Look from the ground for moss, leaves or plants sitting in the trough, and for tiles beside it that have slipped. Indoors, check the ceiling under the valley for stains. A valley takes the water of two slopes, so a small crack in its lead shows up quickly as damp. We go up to photograph the lining and the cut tiles, then tell you whether a repair or a relined trough fits the roof.

Can a listed barn near Berrow be re-roofed in a different tile?

Only with the council's agreement. A listing covers the barn's character, and the covering is part of it, so Malvern Hills District Council decides whether a change of tile is acceptable. We match size, colour and fixings to the existing roof, and quote the list entry in the report. Marley's minimum pitch for each tile also limits the choice, because a tile needs a steep enough slope to shed water.

Does re-roofing a house in Berrow need Building Regulations approval?

Not normally, for a small job in England. The Planning Portal's test is less than 25 per cent of the building envelope and less than 50 per cent of the roof affected. A larger job goes to South Worcestershire Building Control or a registered building control approver. Weight is a separate trigger: a covering 15 per cent or more heavier than the old one needs approval and a structural check, so tell us what is on the roof now.

Which consent applies to roof work on St Faith's church?

The church is listed Grade II* under list entry 1098847. Should it be a Church of England building in use, its works take the faculty route. The Methodist, United Reformed and Roman Catholic churches, and Baptist Union members whose chapel a Schedule 1 trust corporation holds, have an exemption for buildings in use. Where a congregation is Unitarian or Quaker, or a chapel has closed, the building needs listed building consent from the council. Ask the church's governing body before anything is booked.

Who arranges the scaffold licence for a Berrow roof?

Worcestershire County Council's page says the company contracted to do the work is "required to apply"; it charges £85 per week, then £65 for subsequent weeks. A licence is needed only when poles or boards occupy the public highway, and section 169 of the Highways Act 1980 is the law behind it. Our quote carries the scaffold inside its total, and the Berrow start date is fixed once the licence timing is known.

How do I check whether a conservation area covers my Berrow house?

Use Malvern Hills District Council's own list and map of conservation areas, and ask the council if your lane is not clear on them. The council states that no Article 4(2) Directions are currently in force. A conservation area can still matter for a Berrow dormer, so read our planning guide before you plan a roof window or any larger change to the roofline.

Ask for a valley-first Berrow survey

Name the roof you want looked at and what you have noticed from the lane, and we will fix a visit.

10-year workmanship guarantee, in writing