01432 610152 Get a quote Call 01432 610152

Roofers in Bedstone

Gutter, eaves and roof repairs in Bedstone, 28.6 road miles north of central Hereford.

The drive takes about 47 minutes. Our survey runs from the roofline down, with photographs and one written total.

Get a free quoteCall 01432 610152

A church, a manor and a roofline

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Manor Farmhouse, Grade II*Listed in 1951, so roof and roofline repairs are agreed with the council.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    St Mary's church, Grade II*Listed 1968; an Anglican church in use, so its roof goes by faculty.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Grade II buildings 12 and 13Listed in 1968, so changes to the roofline can need consent.

Bedstone from Hereford

Bedstone on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Bedstone roofs, from the eaves outwards

Bedstone surveyed: eaves and soffits, gutters and falls, and two Grade II* buildings

We follow the roofline from the eaves, where the roof breathes, to the gutters that carry its water away, and end at the Grade II* church and manor farmhouse where consent comes first.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Eaves; 2 Gutters; 3 Grade II* walls.

Fig. 1 A village house in section, with eaves, gutter and wall head numbered.

Callout 1 of 3

Eaves and soffits: where a Bedstone roof breathes

At the eaves the slope overhangs the wall, and that lower edge is where the roof's water arrives first. Three parts meet there. The fascia is the board that closes the rafter ends and carries the gutter. The soffit is the underside, closing the gap between fascia and wall. Inside both are the rafter feet, the lowest part of the roof frame. Water spilling from a gutter lands on exactly this spot, so rot can start here, and we probe fascia boards and rafter feet with a blade and photograph any timber that has gone soft.

A fascia that has rotted along one length is renewed along that length. Timber boards on an older house are matched in section, so the roofline keeps its shape, and a rafter end found soft behind a board is repaired with a new section of timber instead of being covered over.

A cold roof, meaning one with insulation at ceiling level and a cold loft above, needs air moving through the loft. For a cold roof with HR underlay, a high-resistance underlay that is not vapour-permeable, Marley gives "25mm along the length of the eaves for pitches of 15° or less; 10mm along the length of the eaves for pitches of more than 15°." Where the underlay lets air through and the ceiling below is well sealed, Marley says "fortuitous ventilation at the eaves via normal eaves construction (3mm) is all that is required", provided the certification conditions are met. We measure the gap that exists before suggesting a vent, because a vent fitted over a blocked gap does nothing.

Soffit boards need care on an older building. Before 2000 is the line HSE draws: a building built or refurbished earlier should be treated as one containing asbestos. A white soffit of that vintage may be AIB, short for asbestos insulating board, and taking AIB out is usually licensed work, which we pass to a licensed firm. Asbestos cement is a separate material, and taking it out with care and in one piece counts as non-licensed work. We stop and have a suspect board identified before anything is cut or drilled.

Eaves can also hold a bird's nest or a bat roost. Section 1 of the 1981 Wildlife and Countryside Act protects a nest that is being built or used, and intentionally damaging it is an offence. Natural England is the body to ask about a bat licence in England, so a fascia change waits until we have looked behind the board. Our guttering, soffits and fascias page explains the full roofline job.

Checked along a Bedstone eaves line

  • Fascia boards for soft or split timber
  • Soffit boards for sagging or staining
  • Rafter feet seen from the loft
  • The ventilation gap at the eaves
  • Nests or roosts before any board comes off

Rot can start where a gutter overflows, so the survey begins at the rafter feet.

Fig. 2 Eaves and gutters, drawn close

Callout 2 of 3

Gutter falls, joints and downpipes

A gutter is a sloping channel, and it works because of the slope. Brett Martin's advice is a fall of "1mm for every 600mm", so a 6 m run drops 10 mm from one end towards the outlet. A bracket that has sagged or a board that has dropped flattens the fall, and standing water then sits in the run. Green lines and a clean stripe along the bottom of the channel show where it has been lying. A level laid along the run shows where the fall has gone, and we photograph those places.

Silt, moss and seedlings fill a gutter, and a full channel spills over the back into the wall. Clearing the run by hand from a platform or tower, then flushing the downpipe, is where a gutter job starts. Leaks come at joints, stop ends and outlets, and a dark overflow mark down the wall below tells us which. Downpipes get a look at the shoe, the bend at the foot, and at where they discharge, since water dumped against a plinth soaks the wall base.

One retailer of uPVC fascia, which has an interest in the answer, says boards "can typically maintain reliable performance for between 20 and 40 years", so a sound board is worth keeping and a gutter can be renewed against it. Some older houses have a box gutter, a channel hidden behind a parapet or lying between two roof slopes. In lead, Royston Lead's table lists Codes 5 to 8 for parapet, box and tapered valley gutters. Where a box gutter or a flat roof is lined with a flexible membrane, the NFRC says BS 6229:2025 sets "a minimum 1:80 finished fall for general roof areas and internal gutters".

Gutters on a two-storey house beside the road may need scaffold on the highway. Section 169 of the Highways Act 1980 requires a licence for that. We arrange the licence with our scaffolder, and the scaffolding is priced into the written total, so no separate bill for it arrives later. Where a gutter fault has already let water into a wall, our roof repairs page covers the slope above as well.

A gutter joint on a Bedstone house

SoundDry joint, even fall, clear outlet, clean wall below
Needs workDrip at the joint, standing water, green stain below

Callout 3 of 3

Two Grade II* buildings and the rules beside them

Our third stop is the wall head, where gutter and roof meet old masonry. Rain runs down the face from there, so we study the stonework or brickwork below for green streaks, damp and open joints as well as the lead or mortar above. Manor Farmhouse (list entry 1366971, first listed 1 December 1951) and the Church of St Mary (list entry 1055017, first listed 21 March 1968) both carry Grade II*. The buildings listed as 12 and 13 (list entry 1055018) and as 4 (list entry 1055020) are Grade II, each first listed on 21 March 1968 like the church. Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 requires listed building consent for works that would affect the special character of a listed building. Listing leaves a house its permitted development rights and adds that requirement, so a new gutter line or a changed fascia is agreed with Shropshire Council first.

The church follows a different rule. St Mary's is a Church of England church with a Communion service on the third Sunday of the month, so while it stays in use its roof is a matter for the faculty jurisdiction and not for the council's listed building consent. A church that closed, or one passed to the Churches Conservation Trust, would lose that exemption, so the churchwardens are asked first before any scaffold goes up.

Shropshire Council records a conservation area named Bedstone, so ask the council whether your address lies inside it. Ask Shropshire Council whether an Article 4 direction applies to your house. The Shropshire Hills National Landscape reaches part of the area, and the council, not the landscape team, decides applications. Shropshire Council decides, and the Bedstone designation matters most for dormers. Our planning guide for roof windows covers a window set in the slope.

Building control for Bedstone is Shropshire Council Building Control on 01743 258710, or a registered building control approver. On a listed building the repair is made in the material the wall already has, and the joint and mortar choices are talked through with the council beforehand, with pictures of each. Our listed and heritage roofing page describes how we plan work on a protected building.

Terms used beside the listed walls

Fascia
The board closing the rafter ends and carrying the gutter.
Soffit
The underside board closing the gap between fascia and wall.
Fall
The slope of a gutter or flat roof towards its outlet.
Faculty
The Church of England's consent system for works to churches in use.

Bedstone roofs, gutters and listings answered

What does the Grade II* listing of Manor Farmhouse mean for its roof in Bedstone?

Manor Farmhouse is Grade II* (list entry 1366971, first listed 1 December 1951). Section 7 of the 1990 Act requires listed building consent for works affecting its character, on top of any permitted development rights the house keeps. Shropshire Council decides, so materials, gutter lines and fascia changes are settled before work starts, and photographs of the roofline can go with the application.

How much fall should a Bedstone gutter have?

Brett Martin advises "1mm for every 600mm", so a 6 m run needs 10 mm of drop towards the outlet. Sagging brackets and dropped boards flatten that slope, and water then stands in the channel. A level along the run at the survey shows where the fall has gone, and the repair restores the slope instead of only refilling the leaking joint.

Can the soffits on an older Bedstone house contain asbestos?

Under HSE's rule, a house built or refurbished before 2000 is assumed to hold asbestos. A white soffit board can be AIB, whose removal is usually licensed work that we pass to a licensed firm. Asbestos cement is different, because a whole sheet lifted out carefully is non-licensed work. We stop and have a suspect board identified before cutting, and HSE asks for a lockable skip when asbestos goes into one.

How much eaves ventilation does a cold roof in Bedstone need?

For a cold roof with HR underlay, Marley gives 25mm along the eaves at pitches of 15° or less and 10mm at more than 15°. Where the underlay passes air and the ceiling below is well sealed, Marley says 3mm of fortuitous ventilation at the eaves is all that is required, if the certification conditions are met. We measure the gap that actually exists at your house before suggesting any change.

Does a roof repair at St Mary's church in Bedstone need listed building consent?

St Mary's is Grade II* (list entry 1055017). Services are held in this Anglican church each month, with local priests covering the Communion during the present vacancy, so roof work goes through the faculty system and Shropshire Council's consent is not needed while that use continues. A closed church would need listed building consent instead, so we speak to the churchwardens before anyone prices the work.

Is Bedstone inside a conservation area or the Shropshire Hills National Landscape?

Shropshire Council records a conservation area named Bedstone, and the council can say where its edge falls for your house. Part of the area also lies inside the National Landscape, which does not decide planning; the council does. Ask the council before a Bedstone dormer is drawn. Ask the council about Article 4 too, because a direction can take away rights your house would otherwise hold. Scaffold on the road needs a Shropshire Council licence at £200, with ten working days' notice, which we arrange with our scaffolder.

Where does the Bedstone roofline leak?

Send the address with a picture of the gutter or eaves, and the survey that follows ends in one written total.

10-year workmanship guarantee, in writing