In brief
MyJobQuote, on a page dated 17 September 2026, gives around £3,200 to remove spray foam from a three-bed detached house, and Checkatrade's July 2026 guide matches that total. Per m² the guides differ. MyJobQuote averages £40, while the other splits the rate by foam type. Those are UK-wide guide figures and not our prices. Ours follows a survey, as one written total.
The published figures, side by side
Two price guides carry removal figures, and they were written weeks apart. Neither is specific to Hereford, and neither is a quote for any house.
Checkatrade's guide, last updated in July 2026, puts removal from a three-bedroom detached at around £3,200.
| Measure | Figure as published |
|---|---|
| Average rate | £40 per m² |
| 3-bed detached property | Around £3,200 |
The two guides agree on the total for a detached three-bed and part company on the unit rate. The second guide splits its rate by foam type, with one row for open-cell and another for closed-cell, which our page on cost per m² sets out row by row.
No rate per m² is ever turned into a whole-roof figure here. The area carrying foam may not be the whole roof, and a flat rate hides how deep the layer is, which is why we only ever read each number against its own unit. The three-bed total is each guide's own, and we pass it on as printed, with the date of the page it came from.
What moves the price on your roof
A guide can only average. What lifts or lowers one job is the roof itself, and these are the points the survey settles:
- the foam type, open-cell or closed-cell, which one guide prices as separate rows
- how thick the layer is and how much of the slope it covers
- whether it sits on the rafters only, or has bonded to the underlay and battens
- whether the covering has to be lifted to free it
- how easy the loft is to reach and work in
- how much waste leaves the site, and whether a skip can stand on the drive
- whether scaffold is needed, and whether it stands on the highway
A scaffold standing on the highway needs a licence (Highways Act 1980 s169), and we arrange the licence with our scaffolder.
On the border, access adds its own twist. A lane too narrow for a lorry, a stone barn conversion with a deep roof void or a terrace with no rear access all change how the waste leaves. We note these on the visit, not from a postcode. Our guide to how spray foam is removed shows what each stage involves.
Costs that can follow once the foam is out
Removal can be the first part of a job. When the timbers can be seen, work that was hidden may show, and the survey is the point where it gets flagged, so nothing arrives as a surprise.
Third-party figures for common follow-on work, each with its source:
- Which?, in a November 2025 survey of Trusted Traders, gives £75 to £400, excluding VAT, for putting right a handful of broken or missing tiles (one to six).
- MyJobQuote, on a page dated 6 October 2026, gives an average roof repair at around £650.
- MyJobQuote, on a page dated 12 October 2026, gives a roof survey at around £300.
New insulation is its own decision, and the choice between foam and mineral wool is weighed in our guide to foam or mineral wool between the rafters. We put no figure on it here, because a published rate cannot fit a roof of your shape.
The written price after the survey is one total. Where re-insulation or repairs are wanted, they sit inside that same total, and you may ask for them to be done separately instead. Read the spray foam removal hub for the full run of guides.
How to read a quote, England and Wales
Whatever the price, check that the quote covers VAT and the scaffold, or says plainly that it does not, and that it names what happens to the foam once it is out of the roof.
The cancellation window is identical for readers in England and Wales. A contract made at your home after our visit can be cancelled up to 14 days after the day the contract was made, and work may only start earlier on your written request.
Planning and Building Regulations come into it only if the covering is replaced:
- England, as the Planning Portal sets it: less than 25 per cent of the total building envelope and less than 50 per cent of the roof affected, with normally no application needed below those limits.
- Wales, as the Welsh Government states it: "In most situations, this work will need Building Regulations approval."
Whether lifting and relaying the same covering counts as re-roofing is for building control to say. If a quote also bundles a new covering, it should say so, and we check with the council's building control team before we start. The Citizens Advice consumer helpline, 0808 223 1133, can talk through a quote you are unsure about. In Wales, 0808 223 1144 is the Welsh-speaking line.
