In brief
Wind drives rain sideways and upwards, into laps, verges, flashings and gaps that stay dry when the rain falls straight. It can also lift a tile or slate so that rain gets under it. Note which side of the house took the wind, where the water showed inside, and what the weather was doing. Those notes, with photographs from the ground, tell us where to start the survey, and the ridge, verges and chimney come first.
Why wind brings in water that still rain does not
A pitched roof sheds rain by gravity. Each tile or slate overlaps the one below, and the water runs down the surface to the gutter. That works until the rain is pushed sideways or upwards. Wind can force water up the slope, under the laps (the overlaps between courses) and into any gap along the edges.
The places that let it in are the junctions. We look at the ridge, where the tiles meet over the apex, then at the verges, which are the sloping edges at the gable ends, and then at the chimney and any wall that a slope runs into. Where roof meets masonry, a thin metal strip called a flashing seals the joint, and one that has lifted or pulled back at its edge will pass wind-driven rain easily.
The other route in is a tile or slate that the wind has moved. It may sit a few millimetres out of line, which leaves the underlay exposed on the side the wind hits. The leak then shows up only when the wind blows from that direction, and stays quiet the rest of the time.
Notes to make while it is happening
Because the leak depends on the weather, the best evidence is a record made at the time. A short note of the wind direction and of where the water showed gives us a head start. We cannot ask the weather to repeat itself, so your notes carry real weight on the survey, and they cost nothing to make.
- which side of the house the wind was hitting, in plain terms such as the road side or the garden side
- where the water appeared: ceiling, wall, or along a timber in the loft
- how long it kept coming, and whether it stopped when the wind dropped
- photographs of the stain or drip, and of the loft above it, taken with a torch
Keep the pictures dated. They help on the survey, and they help if you decide to tell an insurer, as a set of dated shots from the ground and the loft is easy for an insurer to read. For tracing the water back along the roof from a stain, see finding a roof leak. A stain that appears after a windy night and fades within a day or two is still a sign that something is open, and the next gale will find it again.
Survey checks and how each fault is mended
We begin at the skyline and move down the roof, photographing each fault on your own slope and showing you the pictures. These are the checks that matter for a leak that only shows in the wind:
| Place | What we look for |
|---|---|
| Ridge | Cracked or loose bedding, a missing tile, a gap at the end |
| Verge | Crumbled mortar, tiles lifted at the edge, a gap under the cloak |
| Chimney | A flashing pulled back, cracked flaunching, open joints |
| Slopes | Tiles or slates out of line, nail failure, torn underlay |
Inside the loft we also look for staining on the underside of the boards or the felt, because it marks the line the water took. The mending follows the fault. A lifted tile is refixed, or replaced, with a clip or nail on its own account, so the wind has more than a dab of mortar to work against. A flashing is dressed back or renewed in lead, a verge is rebedded, and torn underlay is patched. Our page on leaks where a roof meets a wall covers the flashing case in more detail.
Cost, insurance and the rules across the border
For scale, MyJobQuote's 2026 repair guide averages around £650 for a roof, and Which? gives £75 to £400 for one to six missing or broken standard tiles in its November 2025 survey, excluding VAT. Those are bands for repair work, not for a new roof. Once the survey is done, the work goes into writing as a single total.
If you plan to claim, send the insurer your dated pictures of the stain and the loft first, so it can see what the weather did.
A repair is not a re-roof, so the approval rules are the ones for a patch, not a whole slope, and your survey records the area so the figure is on paper if building control asks for it. In England, the Planning Portal says work normally goes ahead without an application while it affects less than 25 per cent of the building envelope and less than 50 per cent of the roof. In Wales, the Welsh Government's roof page asks for approval once the work passes 25 per cent of the roof area. If the cause turns out to be condensation and not a leak, our page on condensation or a roof leak sets out how to tell. Everything for repairs sits under roof repairs.
