A ladder, a tower and a scaffold each reach a roof in a different way. This guide sets out which suits which repair, and what changes when the scaffold stands on a public pavement.

Horizon Roofing Hereford 9 min read

Every roof repair starts with a way up, and the choice of access shapes the job as much as the choice of tile. A ladder is a route to a working spot. A tower is a small railed platform on a frame. A scaffold is a built structure with boarded decks, guard rails and a stair or ladder to climb it.

Which one a repair needs depends on how far the work reaches along the roof, how much has to be carried up, what stands underneath and how many days the job will run. One slipped slate near the eaves is a small case. A chimney, a long run of verge or a valley deep in the roof is a large one.

Here you will find what each kind of access is for, how it is picked at the survey, what changes once a scaffold is put up on the public highway, and who carries the duties on a home job. Rules are labelled England or Wales where the border changes them. For the wider picture of repair work, see our roof repairs page.

What each way up is for

Each kind of access gives a different thing to stand on, and the repair decides which of them is enough.

Three ways up to a roof repair
AccessWhat it givesWhere it suits
LadderA way up to the eaves or a low roof edgeA look at the gutter, or one tile or slate within reach of the eaves
Mobile towerA railed platform on a frame, stood on level groundWork along a gable end or one stretch of eaves
ScaffoldBoarded decks with guard rails, a stair or ladder, and room to stack materialsChimneys, long runs of ridge or verge, and repairs that run past a day

A ladder is a route, not a workplace. It lets a person reach the roof edge, but it leaves no room to put down a bag of mortar or a roll of lead, and it asks the person on it to lean away from the rungs to work. That suits a quick look and very little else.

A tower puts a flat, railed deck at the height of the work. It needs firm, level ground, which rules it out on a soft lawn or on a drive that slopes away from the wall.

A scaffold is built to fit the house. It runs along the wall at the eaves and can rise to the ridge, with a deck to walk along, guard rails at the edge and a way up that does not rely on a ladder leaned against the roof. It is the choice when the work is high, long or heavy.

How the access for your repair is chosen

At the survey we look at the roof and the ground together, because the answer comes from both. These are the questions we work through:

  • How high is the eaves line, and how far up the slope does the fault sit?
  • How long is the run of work along the roof: one tile, or a whole verge?
  • What has to be carried up: a few clips, or stone, lead and mortar?
  • What stands under the work: a lawn, a gravel drive, a conservatory, a bay window or a flat-roofed extension?
  • Is the ground firm and level where the access has to stand?
  • Will the job take an hour, a day or most of a week?

A slipped slate over a low porch, reached from the gutter line, may need nothing more than a ladder. The same fault above a conservatory roof or a bay window puts the ladder foot on something that cannot carry it, and the answer changes. A chimney stack is different again: its lead flashings are dressed on all four sides, and a person needs a deck to work round them.

The covering is part of the answer too. Stone tilestones, the local sandstone covering on Herefordshire's traditional roofs, are heavy to carry up and awkward to hand along a ladder. A roof with slipped or loose covering is a poor place to rest a ladder head. Where a fault only shows once someone is up there, the plan is revised and you are told, and the written price covers whatever access the job turns out to need.

Our guide to whether every repair needs scaffolding answers the same question from the cost side.

Scaffold on the pavement: the licence rules

Scaffolding that obstructs a public highway needs a council licence. Section 169 of the Highways Act 1980 is the law behind it. The permit is a scaffold licence, and a pavement, a verge and a carriageway all count as highway. Our scaffolder erects the frame; we arrange the licence with our scaffolder, and the council's notice period has to run before the poles go up, so the start date allows for it.

Councils set their own fees and count them in their own units, so these are not like for like:

  • Herefordshire Council (England): £167 for a maximum of 1 month, and £123 per month to extend it. Its guidance asks for the application at least 10 days ahead.
  • Worcestershire County Council (England): £85 per week, then £65 for subsequent weeks, plus a £25 urgency surcharge on urgent applications.
  • Gloucestershire County Council (England): £145 covering a minimum of 28 days, then £36 per 7 days of extension, with the application in at least 12 calendar days ahead.
  • Shropshire Council (England): £200 with no period stated, and at least 10 working days of notice.
  • Monmouthshire County Council (Wales): £108 as an administration fee and £27 per week to extend it, with notice of at least 5 working days.

Herefordshire's page adds that silence from the council is not approval, since tacit consent does not apply, and it asks £335.50 for one month where the licence is sought after the scaffold is already up. Worcestershire's is the one page in this group that names the applicant: the contracted company, it says, is "required to apply". For a Powys address, ask Powys County Council for its current fee and notice.

Who carries the duties on a home job

A roof repair is construction work, and the Construction (Design and Management) Regulations 2015 reach it in England and in Wales. HSE describes a domestic client as "any individual who has construction work carried out on their home, or the home of a family member, that is not done as part of any business".

The regulations do not leave a homeowner holding the client's duties. Under regulation 7(1), they pass to one of three parties:

  • the contractor, where the project has only one contractor
  • the principal contractor, where several contractors are involved
  • the principal designer, where there is a written agreement to that effect

No project goes ahead without a construction phase plan. Where one contractor is working, regulation 15(5) has that contractor draw it up, or arrange for it to be drawn up, as soon as is practicable before setting up a construction site.

For access, this puts the plan for reaching your roof with the people doing the work, set down before the day. It also gives you something to ask for. A sensible question to put to any firm is how each part of the roof will be reached, and why that method was picked over the others.

Where quotes arrive from more than one firm, read what each says about VAT and the scaffold, so the totals you set side by side cover the same work.

Roofs that cannot take a person's weight

Some roofs are poor places to put a ladder head, a foot or a hand. Cement sheet roofing on garages, sheds and farm buildings is one. HSE guidance says "AC roofs are always fragile", and for older buildings, those built or refurbished before 2000, its advice is to assume asbestos is present. Rooflights set into sheeting are another weak point, and so is old timber under a covering that has been wet for a long time.

On a roof like that, the plan changes before anyone climbs up. The access is built so that nobody has to stand on the roof itself, and the work is reached from a tower or scaffold alongside, or from below. A roof that may contain asbestos is left unbroken until the right route for it has been settled.

The same caution applies to a house roof with a long-running leak. The battens or rafters under a wet patch can be soft, and a slate that looks sound can sit on a rotten batten. Gutter fixings and fascia boards can also give way under a ladder head, so the support point matters as much as the ladder foot.

From the garden, binoculars show slipped pieces, lifted lead and mortar in the gutter without anyone leaving the ground. That is a safe first look for an owner, and our guide on whether to fix your own roof sets out where the line falls between looking and climbing. It is one reason we ask owners to leave the roof itself to us.

What to arrange before the day

A little preparation keeps the access simple and the job short. Before the visit:

  • clear the drive, path or lawn edge where the tower or scaffold will stand, and move cars
  • tell us about gates, steps, soft ground and anything under the work, such as a conservatory or a bay window
  • mention if the scaffold will run along a shared boundary or across a path, and let the neighbours know
  • close the windows on the side being worked on, and bring in washing and garden furniture
  • keep children and pets indoors while work is under way

Tell us too if the house stands on a road or lane where a vehicle cannot pull off the carriageway. That settles whether the scaffold has to go out on the highway, and with it whether a licence and its notice period come into the plan.

Say also if the house is old, listed or in a conservation area. A scaffold ties back to the wall in places, and on a stone or timber-framed building the fixing points are chosen with care. Our survey notes where those points can go before the scaffold is booked.

Afterwards the access is dismantled, the ground swept and the waste taken away. You are shown photographs of what was found and what was done, and the price set down in writing is the price that applies to the job, with no extras added at the door.

Reaching the roof: your questions

Can one slipped slate be repaired from a ladder alone?

Sometimes. A ladder suits a short, light job at the eaves or a low roof edge, where nothing heavy has to be carried up. If the fault sits higher, the slope is steep or several faults need reaching, a tower or scaffold is the better choice, and the written price covers it.

Does the scaffold on my house need a council licence?

Where a scaffold obstructs a highway, section 169 of the Highways Act 1980 calls for a licence. Whether yours does depends on where it stands, and the survey settles that. We arrange the licence with our scaffolder, and the notice period has to run first, so the start date allows for it.

Is the scaffold licence fee the same in every county?

No. Councils fix their own fees and units: Herefordshire per month, Worcestershire per week, Gloucestershire per 7 days, and Monmouthshire as one administration fee with a weekly extension. For Powys, check the current terms with Powys County Council. Ask that your quote states whether the licence is included.