Scaffolding and repairs

Does every roof repair need scaffolding?

Many small repairs are done from a ladder or a tower. Scaffold comes in when the work is high, wide or too risky to reach any other way.

Short answer

No. A couple of slipped tiles on a low roof, or clearing a gutter, can be handled from a ladder or a tower, as long as the access is safe. Scaffold is chosen when the work is high, spread over a long run, or needs a platform to stack and carry materials. Where it would stand on the highway, the council has to licence it first. The survey settles which applies, and the written quote shows whether scaffold is in it.

When a ladder or a tower is enough

We pick the access to suit the job, never out of habit. A ladder suits brief, light work close to the eaves. A tower, a wheeled platform with guard rails, gives a firmer stand for work along a wall or around a dormer. Both can be right for a small repair: refixing a tile or two, renewing a short length of flashing, clearing a valley, or replacing a section of guttering.

What rules them out can be one of these:

  • the working height, because a high gable or a three-storey house leaves little margin for error
  • the ground, since a ladder footing on soft or sloping soil can move
  • the length of the run, as a long ridge or verge means stepping off and re-siting again and again
  • carrying heavy materials, such as bags of mortar or lead, up a ladder

You may be tempted to climb a ladder yourself and judge it. Our page on ladders, towers or scaffold for a repair sets out the differences, and fixing your own roof explains why the gutter-height jobs are the ones that catch people out.

When scaffold is the better choice

Scaffold earns its place on larger repairs. Its main advantages are a solid working platform, a guard rail at the edge and the freedom to stack and carry tiles, slates, lead and mortar without climbing every time. That matters for a repair along a ridge or verge, a chimney, which is both high and heavy to work on, and any job that will take more than a short visit.

On a wider roof it can cost less overall to put scaffold up once than to keep moving a ladder or tower. A skyline repair, where we start at the ridge, verge and chimney, is a good example. The platform lets us see and photograph the whole stretch of those details at close range, which a ladder may not allow.

The survey is where this is decided, and the decision is written into the quote. We do not add a scaffold figure after the event. Our written price is a single total that says whether scaffold sits inside it. If you are collecting other prices for the same work, confirm that each one is explicit about VAT and scaffold before you line them up.

Scaffold on the pavement: the council licence

Section 169 of the Highways Act 1980 makes a licence a requirement for scaffolding that blocks the highway. Where a licence applies, we arrange the licence with our scaffolder, and the lead time for it is already counted in the date we quote. A scaffold on your own drive or garden does not need one, which is one reason a front slope and a rear slope can be priced differently.

Each council sets its own charge and notice period, and the units differ from one to the next.

Scaffold licence terms by council
CouncilFeeNotice
Herefordshire (England)£167, a maximum of 1 month; extensions £123 per monthMinimum 10 days
Gloucestershire (England)£145 for a minimum of 28 days; £36 per 7 days to extendMinimum 12 calendar days
Shropshire (England)£200, no period statedMinimum 10 working days
Monmouthshire (Wales)£108 administration fee; £27 per week to extendMinimum 5 working days

Worcestershire County Council charges £85 per week and £65 for subsequent weeks, and says the contracted company must apply. Powys is the one council here where you will need to ask directly what it charges.

Planning scaffold into the job

Because a licence has a notice period, scaffold on a road frontage shapes the date of the repair. Herefordshire Council wants 10 days' notice, Gloucestershire County Council twelve calendar days and Monmouthshire County Council five working days. A repair that cannot wait, such as a make-safe after storm damage, is handled by securing the roof first from the safest access available, and the scaffold and licence follow for the permanent work.

For a repair that is planned, expect this order:

  1. The survey, with photographs and a note of the access.
  2. A written total that spells out what it covers.
  3. The licence applied for where the scaffold meets the highway.
  4. The scaffold, the repair, and the scaffold taken down, with the site left tidy.

If the scaffold stays up for longer than planned because of weather, extension fees apply, and the council terms set the rate. It is worth asking, when the quote arrives, how that possibility has been allowed for. Our roof repairs page shows how access is shown on a typical survey, and the cost of replacing a few broken tiles shows how a small job is priced.

Related questions

Who pays for the council scaffold licence?

It sits inside the written total, so there is no surprise on the final bill. Where a licence is required, our scaffolder and we sort it out together. Whichever roofer you ask, get the scaffold position in writing and read it carefully before you agree, because it is one of the easier items to leave out.

Can a roofer work from a ladder alone on a chimney?

Not safely. A stack is high and awkward to work on, with lead, mortar and pots to carry, so a proper platform is the sensible choice. Before choosing any access we look at the height, the state of the ground below and the pitch of the roof.