In brief
No. A survey is a check of the roof's condition, with photographs and notes on what needs work. A quote is the price for the work you then choose to have done. The survey comes first, because a price given without one is a guess. When we survey for repairs, the findings and photographs lead to one written total price for the job. A survey on its own, with no work attached, is a report you can use for a sale, a lender or an insurer.
What the survey is for
A survey answers one question: what state is the roof in? Our order of work is ridge first, then the verges (the edges of the roof at a gable wall), the chimney stack and each valley (the trough where two slopes run together), before we move onto the open slopes. Flashings and gutters follow, and where there is a hatch we go into the loft to see the roof from underneath.
Every fault gets a photograph taken beside it, and that record stays with the building rather than with whoever wrote the pitch. A survey is allowed to conclude that nothing needs doing yet. A quote cannot say that, because a quote exists to price work.
Three things come out of a survey:
- a list of faults, in the order they matter
- photographs that tie each fault to its place on the roof
- a recommendation to repair or replace, with the reasoning given
Replacement is recommended only when a repair would not hold. If patching makes more sense, the report says that, and the reasons sit beside the photographs.
What a quote is, and what sets it
A quote is an offer to do named work for a stated price, and it carries weight only once somebody has been up and looked. Ours reaches you as one written sum once the survey is done. The roof decides the figure: how high it is and how the crew gets to it, how much needs doing, what covering is on it and how that covering was fixed, and whether the job needs scaffolding.
| Point | Survey | Quote |
|---|---|---|
| Question it answers | What condition is the roof in? | What will this work cost? |
| What you receive | Findings and photographs | A written price for named work |
| Can it conclude no work is needed? | Yes | No |
| Who relies on it | Owner, buyer, seller, lender, insurer | Owner deciding on work |
If you are holding two or three quotes, look at what each one names. The covering, the fixings, the VAT position, any scaffold, and who takes the waste away should all be written down. A price that skips them cannot be set against one that includes them.
A survey with no work attached
Plenty of surveys never lead to a quote. A buyer wants the roof read before exchange, a seller wants to know what a buyer's surveyor will find, a landlord wants a record on file, or an insurer asks how the roof stood on a given date. For all of them the report is the product and nobody is asking for a price.
That is why a survey can be charged for as its own job. MyJobQuote's roof survey page, last updated 12 October 2026, gives roughly £300 as its average figure. Our guide to what a roof survey costs sets out that page's basic, full and drone ranges with their source.
The reverse also happens. Someone gives a figure over the phone, or from one photograph, and it gets called a quote. It is an estimate, and it can move once the roof is seen, because a split batten, a failed valley or an old patch only shows up close. The page on what a roof survey report covers shows what a written report sets down, which lets you judge whether a firm's paperwork is a real survey or only a sales sheet. The main page for roof inspections explains how we run them.
Signing at home: England and Wales
England and Wales share the Consumer Contracts Regulations here. Put your name to a contract in your own living room once the survey is done and the law treats it as made away from the trader's premises, so a 14-day cancellation period applies. If you would like work to begin inside that window, the request has to come from you in writing. An urgent repair you asked someone to attend has no cancellation right at all, under regulation 28(1)(e).
The order of events therefore matters. A survey is not a contract. The quote turns into one when you accept it, and the 14 days end 14 days after the day of that acceptance, not the day a ladder went up.
Before you sign, read the quote for these four points:
- the work described in words that match the survey photographs
- what the figure leaves out, such as VAT or scaffold
- who clears the site and takes the waste away
- the start date, and what happens if weather delays it
The Citizens Advice consumer helpline is 0808 223 1133, with a Welsh-speaking adviser on 0808 223 1144. Which Building Regulations apply to your job differs either side of the border, and the council's building control service or a registered building control approver can say.
