In brief
MyJobQuote's table, dated 12 October 2026, gives a basic visual roof inspection as £100 to £200, a full roof survey as £250 to £400 and a drone roof survey as £200 to £350. Its average roof survey figure is around £300. Treat them as national guide ranges for comparison, never as our prices. Our own written total price follows once we have surveyed your roof.
What a basic visual inspection looks at
A basic visual inspection is a look at the outside of the roof, and we start at the skyline. The surveyor works along the ridge (the line where two slopes meet), the verges (the sloping edges at each gable end), the chimney and the valleys, then across the slopes and along the gutter line at the foot of the roof. The loft is a separate question, because going inside takes more time and needs someone to open the hatch.
On a basic visit we look for, and photograph:
- tiles or slates that have slid, split or gone missing
- ridge mortar or fixings that have crumbled or lifted
- lead and sealant around a chimney stack or a wall abutment
- moss, silted valleys and gutters that hold standing water
- any line on the roof that no longer looks straight from the garden
It is a survey of what can be seen, which is why it costs less than one that opens up the roof or reaches the underlay. The photographs are the useful part. They put each fault on the screen in front of you, so you can judge it without climbing a ladder yourself, and so a later repair price can be set against what the picture shows.
Three survey levels, side by side
MyJobQuote's table separates the visit by how much of the roof is examined, and it gives the average roof survey as around £300. The ranges below are copied from that table. The third column is our own reading of how the levels differ, not MyJobQuote's wording.
| Survey | Range | What more it adds |
|---|---|---|
| Basic visual roof inspection | £100 to £200 | Outside look, photographs |
| Full roof survey | £250 to £400 | Closer look, fuller report |
| Drone roof survey | £200 to £350 | Aerial images of the roof |
The jump from the basic range to the full range pays for more time on the roof and in the loft, for a longer write-up and for a closer look at the places a basic visit can only see from a distance, such as flashings and valley linings. A drone costs more than a basic look because the operator, the flight and the image processing all take effort. We go through the higher levels in what a roof survey costs and the drone figure.
What moves the price up or down
A headline range hides a handful of factors that alter the work. The size and height of the house matter, because a tall gable takes longer to reach and to photograph. The number of chimneys, valleys and separate roof levels matters too, since each is another place to stop and check. A flat extension adds a different covering and a different set of faults.
Access can move a figure more than any of those. Where a ladder reaches the eaves, a visual look needs no scaffold. Where it does not, scaffold standing across a footway or verge needs a licence under the Highways Act 1980 s169, and we arrange the licence with our scaffolder. Any scaffold is named in the written quote from the start, which keeps it from appearing as a late addition.
Three further points change what you are comparing: whether the loft is included, whether you receive a written report or only photographs, and whether the price includes VAT. Ask each one before you set one inspection price against another, because two figures that look alike can cover different amounts of work.
An inspection is not a quote for repairs
A basic inspection tells you what is wrong. It does not price the repair. Our written total price comes once the survey is done, and published cost guides give you a yardstick for judging it. The survey fee and the repair price are two different decisions, and you can take the photographs and think before you commit to any work. It is worth reading how a survey differs from a quote before you book anything.
If the inspection points to a bigger job, the approval rules differ across the border:
- For an English address, the Planning Portal sets two thresholds, 25 per cent of the building envelope and 50 per cent of the roof, and staying below both normally means no application is needed.
- For a Welsh address, gov.wales says re-roofing work needs Building Regulations approval in most situations.
Whichever applies to you, we check with the council's building control team before work starts, so the approval question is settled with the right body early. A basic inspection is where that thinking begins, because it shows how much of the roof is in play. The full picture of what we survey is on the roof inspections page.
