In brief
A flashing has to be held at the wall as well as lying on the roof. Raking out a bed joint gives a slot with a ready-made seat for the lead's upper edge, which is wedged in and pointed over. The wall then holds the lead mechanically, and water running down the brick or stone drops onto the lead and out over the covering. The joint is chosen because mortar can be raked out and renewed without harming the brick or stone.
What happens in the cut joint
Brick and stone walls are laid in courses with mortar between them. Where a flashing meets a wall, a roofer rakes out one of those mortar joints to make a slot, bends the upper edge of the lead to fit it, and tucks it in. Small lead wedges then press the edge against the back of the slot, and fresh mortar is pointed over it.
Each part has a job:
- the slot gives the lead a seat deep inside the wall
- the wedges keep the lead from slipping out while the pointing sets
- the pointing closes the slot so rain cannot run into it
- the lead below the slot is dressed down across the slates, the tiles or the soakers
Rain running down the face of the wall meets the line of the flashing and drops onto the lead, which carries it out over the roof covering. The joint, in other words, is the top of a gutter-shaped path. If the slot were not there, water would run behind the lead's upper edge and find its own way into the house. The page on step, apron and cover flashings shows the shapes lead takes on its way down the slope.
Why a mortar joint and not the brick itself
A chase could in theory be cut anywhere in the wall. The joint is the sensible place for three reasons. Mortar is softer than the brick or stone either side of it, so raking it out takes less effort and does less harm. The joints are already in straight lines, which a stepped flashing can follow up the slope of a gable. And a joint can be repointed, so a worn one is renewed without touching the masonry on either side.
| Method | Held by | Weak point |
|---|---|---|
| Lead tucked into a raked joint | Wedges and pointing | Pointing that weathers away |
| Mortar fillet | The cement itself | Cracks that let it come free |
| Sealant bead | Surface bond | The bond, over time |
| Stuck-on tape | Adhesive | Movement of wall against roof |
A built-in lead flashing relies on its fixing and its lap, not on a glue line, and a roof and a wall do not move together. That is why a flashing is built into the wall by convention. The lead roofing page sets this in the wider picture of leadwork.
When the joint is what has failed
A leak at a flashing can be blamed on the lead when the pointing above it has gone. Frost, rain and age loosen mortar. When it crumbles, the slot opens, the wedges may drop out and the lead's upper edge can slip free of its seat. From the ground the flashing can look sound, because the lead is still lying over the covering.
At a survey we check:
- whether the pointing over the lead is whole, hollow or missing
- whether the lead's top edge is still seated in the slot or has pulled out
- whether the wedges are present along the run
- whether the brick or stone around the joint is sound enough to take new pointing
A stone joint wants more care than a brick one when it is raked out, because the stone beside it can be soft and the edge of a slot is easily chipped. On any house, the mortar for the new pointing should suit the wall, and we match it to how the house was built. The page on why a lead flashing lifts deals with the lead itself.
Price, approval and the written quote
Raking out and repointing a flashing slot is priced after a survey, because no dependable published figure exists for it. For the leadwork itself, MyJobQuote says full chimney leadwork costs between £350 and £920, "depending largely on whether scaffolding is required". That range covers more than the slot, and it is a UK-wide guide, not a Hereford price.
Cutting a slot is a repair to a wall, not a change to its appearance, but a listed house is different. In England the Planning (Listed Buildings and Conservation Areas) Act 1990 section 7 applies to works that would affect character, and in Wales sections 88 and 89 of the Historic Environment (Wales) Act 2023 do the same. A conservation area adds its own controls, and Herefordshire Council says there are 64 of them. For anything unusual, ask the council first.
We give a single written total, with the scaffold, the pointing and the waste taken away counted in. When you hold a quote, see that it says whether the pointing is included, and whether VAT sits in the price.