Short answer
On a cold roof they do, because the loft has to breathe. How big the opening must be depends on the underlay and the pitch. Whatever board is chosen, a new solid soffit must not seal off an eaves gap that the roof depends on. We identify the underlay and see how the insulation sits before a board is chosen.
What a soffit has to do for the roof
A soffit is the board across the underside of the eaves. Behind it there may be a gap, and that gap is how outside air reaches the loft. Warm, moist air drifts up from the rooms below. With nowhere to go, it settles on cold timber and underlay, and a few winters of that can leave dripping, stained rafters and eventually rot.
The idea is a simple path. Cool air comes in at the eaves, passes beneath the covering, and exits near the ridge or through the covering itself. A solid soffit board is fine where nothing relies on that path. A vented soffit has slots or a continuous strip, which lets air through the board.
Two details decide whether your roof is one that needs the gap. First, the underlay, the sheet beneath the tiles or slates. Second, how well the ceiling is sealed and how the insulation meets the eaves. We examine both from inside the loft where access allows, and photograph what we find at the wall plate.
Marley's sizes for a cold roof
Insulation at ceiling level with an open loft above is what makes a roof cold in the trade's sense of the word. Marley, the tile maker, publishes eaves opening sizes for that layout for a roof under high resistance (HR) underlay. Such underlay is not vapour-permeable, so the moving air does all the work. The figures below are Marley's, measured along the eaves.
| Pitch | Gap along the eaves |
|---|---|
| 15° or less | 25mm along the length |
| More than 15° | 10mm along the length |
Marley adds a case for air-permeable (LR) underlay. Where the ceiling is well sealed, "fortuitous ventilation at the eaves via normal eaves construction (3mm) is all that is required", provided the third-party certification terms are honoured. BS 5250 sits behind these figures. It is a British Standard, so the same figures apply in England and in Wales. A warm roof, with insulation at the rafters, follows other rules.
We read the underlay at the eaves instead of guessing, and the product certificate for it is the final word. Where the sheet carries no marking, the maker's literature or a loft inspection settles it, and the answer goes in your file with the photographs.
Fitting a new soffit without blocking the air
New soffits go wrong when they close a gap that was doing a job. A plain board fixed flush across an old ventilated one can seal the eaves for good. Quilt shoved hard into the corner from inside the loft can do the same job from the other side. A vented soffit can look the same from the road as a solid one, which is why the board is checked from underneath.
When a roofline is renewed, these are the points to settle:
- a vented board or a vent strip wherever the old soffit let air in
- an eaves tray or baffle, so that quilt cannot smother the gap
- the timbers behind checked and made sound before boards go up
- the underlay identified, so that the right opening is chosen
Mesh is part of a vent strip, and birds nesting behind roofline boards are a separate matter, covered in our guide to birds nesting behind fascias. The plastic tray fitted along the eaves is explained on the page about the eaves protection tray. The guttering, soffits and fascias page shows how the pieces fit together.
Old boards, new boards and the quote
When a soffit is replaced, the old board comes down and the timbers behind it are looked over. If it is a flat white panel from an older house, it could be asbestos insulating board, and HSE's advice is to suspect asbestos in any building built or refurbished before 2000. A laboratory result comes first, and anything licensable passes to a licensed firm. Our page on asbestos in soffits covers that stage.
Roofline boards can be renewed together with the fascia and gutter, so the vent decision is made once and written down with the rest of the work. What reaches you is one written total, covering boards, vents and access, after the survey.
Ventilation belongs to the design of the roof, so it is settled during the survey and not left until the boards arrive. A handsome board that lets no air through has failed at its main task, and the survey is how we avoid that outcome. If the ventilation turns out to be fine as it stands, the report records that, and the boards are left well alone.