Short answer
NFRC says BS 6229:2025 sets a minimum 1:80 finished fall for general roof areas and internal gutters, a drop of 12.5 mm for every metre of run. IKO's advice is to design for 1:40 when 1:80 is the target. The standard covers flexible waterproof membranes on flat roofs in England and Wales alike, and lead roofs sit outside it.
What 1:80 means in millimetres
A fall is written as a ratio. In 1:80, the roof drops 1 unit for every 80 units of run, so over a metre it drops 12.5 mm. Gutters follow the same idea at a gentler slope: Brett Martin gives 1 mm for every 600 mm of gutter.
| Ratio | Drop over 1 m | Where it comes from |
|---|---|---|
| 1:80 | 12.5 mm | NFRC, minimum finished fall in BS 6229:2025 |
| 1:40 | 25 mm | IKO, the fall to design for |
| 1:600 | 1 mm per 600 mm | Brett Martin, guttering |
On a roof 3 m deep, 1:80 is a drop of 37.5 mm between the high edge and the low one. That is a small step to see by eye, which is why a fall cannot be judged from a ladder and has to be measured or tested with water.
A ratio helps when two quotes use different language. One may say 1 in 80 and another 12.5 mm per metre, and both describe the same slope. If a figure is given as a percentage or an angle, ask for it as millimetres per metre, since that is the form a person on the roof can check with a tape and a level.
Finished fall and design fall are different numbers
The 1:80 figure is a finished fall. It describes what the roof must achieve once it is built and covered, and NFRC calls it a minimum, so it is the floor and not the drawing.
IKO sets out the pairing in its own words: to achieve 1:80, the code of practice says the roof should be designed for 1:40. That is a manufacturer's advice about the standard and not a second rule inside it.
We keep the two numbers apart when we talk to you. A roof that reads 1:80 on a measure sits exactly on the minimum, with nothing in hand. When we survey, we quote what the roof measures today, and when we propose a new deck, we describe the fall it is designed to, so the two never get muddled on paper. If your roof falls short, the report names the stretch where the shortfall sits.
None of this applies to a pitched roof. A fall is a flat-roof idea, and it only has meaning where the covering is a continuously supported membrane such as felt, EPDM or GRP.
How a fall is made, and how we check yours
A deck can be given its fall in three ways: by laying the joists at a slope, by fixing tapered timber strips called firrings on top of level joists, or by using tapered insulation boards. Each changes the build-up and the height at the edges, so the choice belongs to the survey and not to the day of the work.
On an existing roof we look for the signs that the fall is short:
- water still lying after the rain has stopped, or a stain line round a shallow patch
- a dip along the line of the joists, felt through the boards underfoot
- silt and moss collecting at one spot
- an outlet set higher than the surface around it
Our pages on flat roof falls and drainage and on ponding water take these further. Where the roof is only a little short of its fall, a local area of tapered boards can sometimes help. Where the whole deck is flat, a full re-lay may be the answer, and we explain which applies in writing, with photographs from your own roof beside each point.
Which standard applies, and what about the border
BS 6229:2025 is the current edition. The 2018 edition was withdrawn on 16 December 2025, so a quote or specification citing the 2018 text is out of date. The scope is flat roofs, or curved ones pitched at no more than 10 degrees, finished with a flexible waterproof covering that is supported continuously. Lead is outside it: AD C cites BS 6915 for lead.
A British Standard is the same document in England and in Wales. The Building Regulations that surround it are not. In England, Approved Document L (2021 edition) treats a renewed flat-roof membrane as renovation, which brings Table 4.3 with it. In Wales, paragraph 11.16 of the Welsh Approved Document L does the same, and Table 11.1 applies.
For a new fall that raises the edges, we ask the council's building control service, or a registered building control approver, what applies at your address. The full list of flat roof questions starts at the flat roofing hub, and which BS 6229 applies now deals with the editions.