In brief
Building Regulations are devolved in Wales, and the insulation rules sit in the Welsh Approved Document L, volume 1. Table 4.1 sets the worst acceptable figure at 0.13 where a roof is newly built onto a house that already stands. A flat roof that is renovated, which includes a replaced waterproof layer, is taken to 0.16, and to no worse than 0.35 where 0.16 cannot be reached (Table 11.1). The Welsh Government says re-roofing in most situations needs approval.
Which Welsh figure applies to which job
The Welsh Approved Document L, volume 1, is the 2022 edition incorporating 2024 amendments, and states that it takes effect on 23 November 2022 for use in Wales. U-values are written in W/m²K and measure heat escaping through a structure: the smaller the figure, the less heat the roof lets out.
The figure you meet depends on the job:
- an added roof on an existing home, such as an extension's: Table 4.1 gives 0.13
- a roof window in that new roof: 1.4, or a minimum Window Energy Rating Band B
- a rooflight: 2.2
- an existing flat roof being renovated: Table 11.1, with 0.16 as the standard and 0.35 as the limiting figure
Regulation 2 of the Building Regulations 2010 defines a thermal element as walls, floors and roofs, with windows, doors and rooflights outside it. That is why renewing a roof draws insulation into the discussion even when the work looks like a surface job, and why a rooflight is judged on its own figure.
The warm deck or cold deck page shows where the insulation sits in each build, and the flat roofing hub covers the coverings.
Renovating a flat roof: 0.16, 0.35 and the half-roof line
The Welsh Government's guidance on re-covering says that, since a roof is a thermal element, the work should come with better insulation. The Welsh Approved Document L turns that into tests.
Under paragraph 11.14 the roof as a whole is upgraded once more than 50% of its surface is renovated, or when the job amounts to a major renovation of the building. Paragraph 11.16 lists a flat roof's replaced waterproof membrane as qualifying work. Table 11.1 then sets two columns for flat roofs and roofs with integral insulation: column (a) at 0.16 W/m²K and column (b) at 0.35, so the aim and the limit sit side by side in one table.
The figure to keep straight is 0.35, which is the limit on the result and not a trigger. Where 0.16 cannot be reached for economic, functional or technical reasons, paragraphs 11.20 and 11.21 ask for the best standard that can be, and say that generally the roof should be no worse than 0.35. On the cost side, the document's test is whether the outlay comes back through energy savings within 15 years.
Small jobs sit differently, and that is covered in the last section.
Approval, building control and the new regime
On re-roofing, the Welsh Government's page reads: "In most situations, this work will need Building Regulations approval." For flat roofs the guidance leaves room for small repairs that need no application at all, but cautions that renewing a roof which carries its own insulation may mean improving that layer as well. A new rooflight generally needs approval as well.
Building control is done by the council or by a registered building control approver. The Building Safety Regulator oversees registered approvers and inspectors for the Welsh Ministers, whereas councils answer to the Welsh Ministers directly. For a Powys address we go to the council's building control service or a registered building control approver.
A new regime came into force in Wales on 1 July 2026. For non-higher-risk work, the Welsh Government says it swaps the deposit of plans for applications for building control, and that approval lapses automatically after three years. A roof that waits a long time for its start therefore needs its approval checked before the first sheet is laid.
What changes in March 2027 and what to ask for
A successor Welsh Approved Document L, volume 1, takes effect on 4 March 2027 for use in Wales. It does not apply now, and work started under the present edition follows the present edition. If your roof is planned for the winter or spring, ask the building control body which edition will govern it.
Whatever the date, a written quote for a Welsh flat roof should state:
- whether the insulation is being upgraded, and to which U-value
- the type and thickness of insulation chosen
- whether the roof is a warm deck, with the insulation above the deck, or a cold deck
- who deals with the application to building control
Small repairs are a different question, because the Welsh Government's guidance treats a minor repair differently from a re-cover, and the council or approver is the one to confirm which side a job falls on. The page on whether a new membrane is a renovation goes through the test.
We check the position with the council or the approver before pricing, and our quote, one total in writing, follows the survey.