A conservatory that is dry in the middle of the roof and wet in one corner is telling you something. The glazing itself may be sound. The trouble is at the point where the roof stops and the house begins, a line of flashing, mortar and sealant that has to stay tight while two structures move against each other through every season.
This guide starts with how that joint is built and where it gives way. It then shows how to read a stain on the wall or the ceiling, what lead is used for and in which thickness, and how a patch differs from a re-flash or a new roof. Each rule it mentions is labelled England or Wales in the same sentence, since the approval route for roof work is not the same on both sides of the Welsh border.
The overview of the whole service is on our conservatory roofs page, and a shorter answer to the everyday question sits in why a conservatory roof leaks.
How the junction is built, and why it fails
A conservatory leans on the house. Its roof rises to meet the house wall along a line called the abutment, and that line has to stay watertight while two different structures move beneath it. The house wall is brick, stone or render on foundations of its own. The conservatory sits on lighter foundations and carries a frame that warms in sun and cools overnight. Some movement at the joint is normal. What matters is whether the weatherproofing was built to accept it.
The weatherproofing is normally lead. The flashing is a strip of lead turned up the wall and down over the edge of the roof covering. Its top edge is tucked into a chase, a groove cut into a mortar joint, held there with lead wedges and pointed over. Where the roof covering is tile or slate, small folded lead pieces called soakers sit under each course and run up the wall beneath the flashing. On a glazed roof the lead is dressed over the capping that closes the end of the glazing bars.
Each part of that arrangement can let go on its own:
- the pointing over the chase cracks or falls out, and the top edge of the lead lifts
- the lead tears or splits where movement has bent it back and forth
- sealant used in place of a chase shrinks away from the brick
- the lead sits too loose over the roof edge, and wind drives rain behind it
Reading the stain: what each mark points to
The place where moisture appears narrows the search before anyone goes up a ladder. A stain on the house wall inside the conservatory is a different clue from a drip on a glazing bar, and both differ from a damp patch on the ceiling of the room above the junction.
| Where it shows | What it points to |
|---|---|
| Inside the conservatory, at the top of the house wall | The abutment flashing, the chase and the pointing |
| A line of drips along the glazing bar nearest the wall | The seal between bar, capping and flashing |
| Damp patch on the ceiling or wall of the room above | A flashing that stops short of the roof edge or the house gutter |
| Stain at one end of the junction only | The end of the flashing, where the roof meets a side wall |
The shape of the roof adds to the length of joint. A lean-to has one abutment along its top. A roof with several facets has a longer line to keep watertight, with a flashing at each change of angle.
The timing counts as well. A drip in every shower suggests a gap that is always open. A mark that turns up only when wind throws rain at that side of the house suggests a gap facing the weather, where rain is pushed sideways under a lap or behind a flashing.
Not every wet mark is a leak. Condensation on cold glass can run down the bars and look like a drip. Our page on condensation under a conservatory roof separates the two. Read it before booking anyone to a roof that may be perfectly sound.
Lead: what the codes mean and what lasts
Lead sheet comes in numbered codes, each a thickness. Royston Lead's cast-lead brochure marks each code with the uses it is made for, and the ones that matter at a conservatory wall are:
- Code 3, 1.32 mm, green: "Recommended for lead soakers only"
- Code 4, 1.80 mm, blue: soakers, flashings, valley gutters on pitched roofs and dormers
- Code 5, 2.24 mm, red: flashings, pitched valley gutters, dormers, parapets and box gutters
- Code 6, 2.65 mm, black: the same uses as Code 5
So a soaker may be a lighter code, and a flashing starts at Code 4. Which code goes onto your junction depends on its length and how exposed it is, and we settle that on the survey, never from a chart alone.
On lifespan, MyJobQuote says a well-fitted lead flashing "can last for over 80 years". That is a hedged claim from one source, and it assumes the lead is fixed so that it can move. The longer ranges HomeBuilding and Less give are for lead flat roofs, a separate job, so they are not read across to a wall flashing, and none of this is a promise for any single junction.
Lead is soft and heavy, so it is fixed at the top and left free at the bottom, where it overlaps the covering. Tacked down along its lower edge as well, it splits as it moves.
The point for a conservatory is that lead can outlast the sealant and the mortar around it. When a junction fails, the lead may be sound while the fixings are what need redoing, and a survey can tell the two apart.
Why sealant on its own is a stop-gap
A tube of sealant run along the top edge of a flashing is the quick fix, and it can hold for a season. It also hides the evidence. Sealant bonds to the brick on one side and the lead on the other, and those two surfaces move apart and together every day. Over time it hardens, shrinks and splits along the line where it was meant to stay stuck, and the repair has to be done again.
A lasting repair goes the other way and lets the junction take movement. The options are:
- raking out the failed pointing, re-wedging the lead into the chase and pointing it again
- replacing a short length of flashing that has split or lifted
- replacing the whole run, with new soakers under tile or slate courses where they are present
- adding a cover flashing, a second strip over the first, where the original upstand is too short
Which of those a junction needs becomes clear once the old lead is lifted. We photograph what is under it, show you the pictures before a price is agreed, and leave the wall tidy. Where the lower edge of the flashing has been bedded in mortar or foam instead of lapping over the covering, that is photographed too, because it explains how the water got behind.
A written price for a repair of this kind is one total, given after the survey. Replacing the whole run is a bigger job than lifting one corner, and access is the main thing that moves the price: a ladder reaches a low lean-to, but a taller wall may need a tower or scaffold, and the quote says which is included.
What a repair costs, and when it becomes a re-roof
These are third-party typical UK ranges, never our prices. MyJobQuote's page on chimney lead puts a patch repair at around £200, a full replacement at around £570 and full leadwork at £350 to £920, and says the spread depends largely on whether scaffolding is needed. That page is about chimneys, so treat it as a guide to the order of cost, not a quote for a conservatory wall. For a whole conservatory roof, MyJobQuote gives an average replacement of £3,200 to £6,000 in 2026.
A flashing repair affects only a minor area of the roof, and the approval route for the wider roof only matters if the job grows into re-roofing:
- In England, the Planning Portal's re-roofing test has two thresholds, one for the building envelope and one for the roof. A repair to a flashing sits well below both.
- In Wales, the Welsh Government says of re-roofing that "In most situations, this work will need Building Regulations approval."
- In England, the Planning Portal also says that a new roof on a conservatory must comply with building regulations, so replacing the glazing is a question for building control first.
Two prices for this work compare fairly only when both cover the same length of junction and the same access. Either way, a written quote follows a survey and gives one total. Check that the figure is stated with or without VAT, and that it says whether scaffold is in it.
What you can safely check before we visit
You do not need a ladder to give a surveyor a head start. From inside the conservatory and from the ground, you can collect the clues that shorten the visit.
- Photograph the stain next to a coin or a tape measure, and note the date and the weather that day.
- Look along the top of the house wall from the garden with binoculars for lifted lead, gaps in the pointing or a bead of sealant that has pulled away.
- Check the gutter beside the junction for blockage, since an overflowing gutter can soak the wall and mimic a roof leak.
- Run a dry finger along the bottom of the flashing inside, where it is within reach, to see whether the edge is loose.
Stay off the conservatory roof. Glass cracks under a foot, and polycarbonate bends and gives. The house roof above the junction is a job for proper ladders and a harness, which is why the first call is to the phone rather than the garden.
Our guide to gutters and lead on conservatories covers the drainage side of the same joint, and it is worth a read if the wet patch sits close to a downpipe.
Keep the photographs and any earlier invoices for the junction together. They show what was done before and where the new work should begin, and they save time at the survey when the wet patch has dried out by the time we arrive.