In brief
Sometimes. Rain alone does not stop every job, but a wet roof is slippery and many materials will not bed or bond until they are dry. Making a roof weather-tight with a temporary cover can go ahead in the wet. Mortar, sealant, flat roof coverings and open re-roofing work are held back. The roofer decides on the day, on the roof, and should say what has moved and why.
What decides whether work goes ahead
No weather rule fits every roof. The decision is made on the day, first from the ground and then on the roof, and it rests on four things:
- The surface. Wet slate, tile and metal are slippery underfoot, and ladder rungs and scaffold boards get worse in the same way.
- The wind. A gusty day makes it unsafe to carry sheets, long lengths of lead or a roll of membrane up a slope, however dry the roof is.
- The material. Some products are laid dry, and others rely on mortar, adhesive or sealant that needs a dry base.
- What is open. A strip of bare batten or old underlay can only be left exposed if it can be covered quickly.
A leak coming through your ceiling is not something to put off for the weather, and a roofer who sees one will say what can be done that day. A roofer may do a different job from the one you booked, such as making the area safe first, and come back for the proper repair once the roof has dried.
Jobs that can go ahead in the wet
Work that keeps water out, or that is done from the ground and the gutters, is the usual wet-weather work. It tends to be a stopgap, not the finished repair.
- Temporary cover: a tarpaulin fixed over a gap or a missing section, or a slate or tile put back loosely to stop the worst of the entry.
- Photographs: we photograph the visible faults, from a ladder or the ground where that is safe, so a record exists before anything is moved.
- Clearing blocked gutters and hoppers, where the leak is overflow. A fault in a downpipe is easy to see while water is running through it.
A wet day also shows what a dry one hides. Water tracking down a wall, a stain spreading across a ceiling or damp beneath a valley points to where the entry is. We note it, then carry out the permanent repair in dry conditions.
If you want an urgent repair visit, say so plainly. The 14-day cancellation right does not apply where you have specifically requested a visit for urgent repairs, in England and in Wales (Consumer Contracts Regulations 2013, regulation 28(1)(e)).
Jobs that wait for dry weather
A job waits because of what it is made of, more than because of how much rain is falling.
| Job | Why it waits |
|---|---|
| Ridge and hip bedding | Fresh mortar can wash out before it sets |
| Lead flashings and sealant | Sealant and pointing need a dry joint |
| Flat roof coverings | The deck should be dry before felt, rubber or GRP goes on |
| Full re-roof or re-slate | A stripped slope is open to the weather until it is covered |
A re-roof is planned around this. We strip in sections that can be closed in before the day finishes, and on an unsettled day a slope stays closed. Chimney flashings are a good example of the split: we can inspect one in the rain, but the pointing that holds it waits for a dry joint.
Flat roofs are the most sensitive, because the covering sits straight on the deck and any trapped moisture stays there. Our page on what a written roof quote covers shows where a delay clause belongs, and the same thinking runs through our roofing work across Hereford and the border.
What to ask for in the quote
A wet spell can push a roof job past its start date, so it is worth asking how it will be handled before you sign. Three questions are enough:
- If the weather stops the work, how will you be told, and who rebooks the date?
- If a slope has to be left open overnight, how is it covered?
- Does the written price stay the same whatever the weather does?
Ask for each answer in writing, and keep the reply with your other papers for the job. Our price arrives as one total in writing once the survey is done, so a delay should mean a new date to agree, not a surprise on the bill.
The law also protects you if you sign at home. The Consumer Contracts Regulations 2013 give you 14 days to cancel when the contract is signed in your own house after a survey, in England and in Wales alike. To start sooner, put that request in writing. The Citizens Advice consumer helpline is 0808 223 1133, or 0808 223 1144 for a Welsh-speaking adviser. For leaks that follow a storm, see what counts as a storm for insurance.