In brief
Sign for roof work at your own door after we have surveyed, and the Consumer Contracts Regulations 2013 give you 14 days to change your mind. For a services contract, those days run on from the day after you sign. Those rules bind both countries equally. The single exception is an urgent repair that you specifically requested a visit for, where no cancellation right exists.
When the 14 days apply
The right comes from regulations 5 and 30 of the Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013. Regulation 5 counts as off-premises any contract made while trader and customer are physically together somewhere other than the trader's own business premises. Your living room after a roof survey fits that description, so a roofing contract signed there is covered.
Regulation 30 sets the length. The cancellation period for services ends at the end of 14 days after the day on which the contract is entered into. In practice, count from the day after you sign, with the fourteenth day as the last. Sign on a Monday and the period runs out two weeks later, on the Monday.
These are UK rules, so Herefordshire, Monmouthshire and Powys are treated identically. Nothing at the Welsh border changes the length of the period or the way it is counted.
You may cancel without giving a reason. Put the notice in writing, retain a copy and write down the date it went, so that the day can be proved if anyone queries it later. An email or a letter to the firm is enough.
Starting the work inside the 14 days
Sometimes the job cannot wait, because the weather has turned or a leak is spreading. Beginning early is allowed, with a safeguard. Under regulation 36, work starts inside the period only when the customer asks for it, and where the deal was struck away from the trader's premises the request has to come on a durable medium. In everyday terms, that means in writing.
So the sequence runs like this:
- We survey, then give you a written total price.
- You sign at home, and the 14 days begin.
- If you would like an earlier start, you ask us in writing.
- Without that request, we hold off until the period has ended.
A chat on the doorstep does not count, and neither does a nod. If you prefer to wait, that is fine, and the scaffold goes up once the period has run. Before you decide on an early start, ask what would happen on payment if you cancelled after work had begun, and have the answer set down in writing. Citizens Advice is a sensible second opinion on what a trader may charge for work already done.
When there is no right to cancel
The exception sits in regulation 28(1)(e). The right does not apply where the consumer has specifically asked the trader to visit to carry out urgent repairs or maintenance. Citizens Advice makes the point in plain words, saying there is no cooling-off period for urgent repairs where the business was invited into your home to do them.
| Situation | Right to cancel? |
|---|---|
| Planned re-roof agreed at home after a survey | Yes, 14 days |
| You rang and asked for an urgent repair visit | No, under reg 28(1)(e) |
| Work begun early at your written request | Ask for the terms in writing first |
An emergency make-safe after a storm that you phoned to request is therefore outside the 14 days, while a planned re-roof agreed from a quote is inside them. One household can have both: an urgent patch, then a later re-cover under a fresh contract. Each contract is judged on its own facts, so if you are unsure which category yours falls in, ask us before you sign anything.
Where to turn if something goes wrong
Section 49 of the Consumer Rights Act 2015 requires reasonable care and skill from anyone supplying a service. That covers roof work for householders in both countries, whether or not you cancelled. If a dispute arises after signing, begin by complaining to the firm in writing and saying what outcome you want.
The Citizens Advice consumer helpline is 0808 223 1133. In Wales you can reach a Welsh-speaking adviser on 0808 223 1144. Citizens Advice can forward details of a complaint to Trading Standards, which you cannot do yourself, so the helpline is the way in. Since 6 April 2026 the duty on a trader to point you to an alternative dispute resolution scheme has come from section 308 of the 2024 Act on digital markets, competition and consumers.
Keep the survey photographs, the written quote and the signed contract together in one folder. Our page on where to turn when you are unhappy with roof work follows this up, and the page on written roof quotes sets out what to check before you sign. The Horizon Roofing homepage lists everything else we do.
