People who search for the best time of year to replace a roof may want one of two answers: a month, or a bargain. No single month suits every roof, and a re-roof is priced from the roof in front of the roofer, its covering and its access. What the calendar does change is the risk to an open roof, the supply of materials, and what may be living in the structure.
This post takes those in turn. It starts with how a re-roof is run through changeable weather, then asks whether a failing roof should wait for a better season. After that it covers the law on nesting birds and on bats, which binds on both sides of the border, and the paperwork that can set the start day: a scaffold licence for the highway, and Building Regulations approval for a house in Wales.
The advice on weather is general, in plain words and without figures. Where timing matters to the law, we say who to ask.
How a re-roof is run through changeable weather
A re-roof strips a slope, relays it and closes it up again, so the house is exposed only in sections. We work slope by slope and leave nothing stripped overnight; if rain is forecast, the open area is sheeted before we go. That holds in any month, which is why a re-roof can be planned for almost any time of year.
| Weather | Effect on the roof | What changes on site |
|---|---|---|
| Rain | Water reaches the underlay, battens and the loft below | The open slope is sheeted and that work waits until it is dry |
| Strong wind | Sheets and loose tiles lift, and scaffold sheeting catches the gusts | Lifting waits, and stacked materials are tied down |
| Frost or ice | Boards, ladders and slopes turn slippery | The start is delayed until surfaces are safe to stand on |
| A long dry spell | The easiest conditions for working at height | Slopes go faster, but the roof is still closed up every evening |
The forecast for the days the roof is open matters more than the name of the month. A sensible plan has the strip and re-cover of each slope sit inside a spell that the forecast supports, with a spare day in hand for the weather that arrives anyway.
That is also why a firm date given months ahead should be read as a target. A roofer who promises a date regardless of the forecast is promising something the weather will not honour.
A failing roof should not wait for the right season
A roof that is already letting water in does not improve by waiting for spring. Damp timber and soaked plaster make for a longer job, and every storm tests the weakest spot once more. If water is coming through, the first job is a temporary repair to make the roof safe, and the re-roof is planned from there. Our guide to making a roof safe after damage sets out the options.
Winter work is possible. It is a matter of planning around the weather, not of avoiding it, with short working days allowed for and each slope closed before dusk. Our answer on whether a roof can be replaced in winter goes into the detail.
Signs that a roof is asking for attention sooner than the calendar suggests:
- daylight showing through the roof from the loft
- damp patches or brown rings on a top-floor ceiling that grow after rain
- slipped, cracked or missing tiles on more than one slope
- sagging along a ridge or a slope
- a loft that smells damp, with darkened rafters or battens
None of these means the whole roof must come off. A survey separates a roof that needs a repair from one that needs replacing, and we offer replacement only when it is the straight answer. If the survey points to replacement, the date is then chosen with the weather, the materials and the paperwork in mind. The photographs we take of your own roof show what each of those turns on.
Nesting birds: what the law says
Stripping a roof can disturb birds that nest in the eaves, behind fascias and under the ridge. The Wildlife and Countryside Act 1981 applies in England and Wales alike, and its section 1 makes it an offence to intentionally take a wild bird's nest, or to damage or destroy it, when the nest is in use or in the course of being built.
The word that matters is "intentionally". A roofer who looks first, finds an active nest and leaves it alone is not in the position of one who clears it away without looking. Timing is built into the offence, so an old, empty nest is a different matter.
We will not name a safe month for you, because birds do not keep to a calendar. So the check is made at the roof itself:
- the eaves, soffit boxes and fascia ends are looked at before the scaffold goes up
- the ridge and the verges are looked at as each slope is opened
- where birds are sitting, work around that spot waits, and you are told why
In practice, a job can start on time across the rest of the roof while one corner is left alone until the nest is empty. That is a better outcome than a stripped slope with a nest on it, and the photographs show what was found and where. Gutter and fascia work, which sits right where birds like to nest, gets the same look before it begins.
Bats and the roof they may be using
Bats are covered by stricter rules, and those rules apply whatever the weather is doing. The GOV.UK bats guidance for England states: "All bat species, their breeding sites and resting places are fully protected by law". Among the work that can harm them, it names "repairing or replacing a roof", and it adds "You may be able to get a licence from Natural England".
Three separate pieces of law sit behind that:
- Section 9(4) of the Wildlife and Countryside Act 1981 catches anyone who, "intentionally or recklessly", disturbs a bat while it is sheltering in its roost.
- The same subsection catches anyone who blocks the way in.
- Regulation 43 of the 2017 Habitats Regulations treats damage to what it calls a breeding site or resting place, in plain terms a roost, as an offence in itself, and the offence does not depend on intent.
Licences come from a different body on each side of the line. In England it is Natural England. In Wales it is Natural Resources Wales, which requires an application before any work that could affect a protected species. The body that deals with it is set by the house's location, not by the roofer's base.
So where bats are known or suspected, the work in that part of the roof pauses until the licence route is clear, and the rest of the survey carries on around it. Our answer on a bat survey before re-roofing explains what to expect.
Lead times, licences and approvals that set the start day
Several things have to be in place before a date is firm, and each runs at its own pace whatever the season.
- Materials. SPAB, which advises on old buildings, says: "Claims of unavailability or long delivery times should always be checked with the quarries." The county's stone atlas notes that only a few quarries still cut the St Maughans sandstones for building and roofing stone. A roof that needs matching stone tiles or slates is ordered before the date is fixed.
- The scaffold licence. A scaffold on the public highway needs the council's licence, the Highways Act 1980 section 169 being the law behind it, and we arrange the licence with our scaffolder. In England, Herefordshire Council asks for the application a minimum of 10 days before the scaffold goes up. In Wales, Monmouthshire County Council wants at least 5 working days.
- Building control, England. The Planning Portal test of under 25 per cent of the building envelope and under 50 per cent of the roof decides whether an application is normally needed.
- Building control, Wales. The Welsh Government says of re-roofing: "In most situations, this work will need Building Regulations approval." On a Welsh job we check before the date is promised.
Put together, the start day of a re-roof may not be just the first dry week. It is the first week when the materials, the licence, the approval and the forecast all line up. Asking about each of them when you collect quotes tells you whether a date is real. Our roof replacement page sets out the whole sequence, from survey to the final clear-up.
Planning around the house as well as the season
Once the date is real, the rest of the planning is about the house and the people in it. A re-roof is noisy and dusty for the days it runs, and a little preparation makes those days easier. Our guide to living at home during a re-roof goes through them in full.
The short list that matters at any time of year:
- Shift anything dust-sensitive out of the loft, since the roof above it is being worked on.
- Move cars and bins away from the drive and the house walls so that materials and waste can be placed and carried.
- Tell the neighbours the dates, especially if the scaffold or a skip will sit near their boundary.
- Children and animals need to stay clear of the scaffold and the area beneath the work.
- Cover or move plants and garden furniture along the eaves.
At the end of the job the rubbish is taken off site and the ground is swept. In summer, windows and doors can stand open and dust finds them. In winter, the opposite problem is a house that cannot be left unheated while a slope is open, so the heating stays on and the loft hatch stays shut.
If anyone in the house works from home or sleeps by day, say so when the dates are agreed. The order in which the slopes are done can be arranged to keep the noisiest work away from the rooms you need most.