01432 610152 Get a quote Call 01432 610152

Roofers in Tarrington

Verge, valley and gutter repairs for Tarrington, 7.8 road miles east of Hereford.

The gable edge is the first stop, everything seen is photographed, and one written total comes back once the survey is done.

Get a free quoteCall 01432 610152

Verges, valleys and gutters on Tarrington roofs

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Verges on framed gablesThe verge is the roof edge at a gable and needs a firm bed.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Valleys that hold mossLeaves and moss collect in a valley and keep the lead wet.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Gutters and soffitsOverflowing gutters and tired soffits point to work at the eaves.

Finding Tarrington

Tarrington on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Tarrington roofs, edge by edge

Verge, valley and gutter: three checks on a Tarrington roof

On a Tarrington house we follow the water: from the verge at the gable edge, through the valley that gathers two slopes, to the gutter and the listed cottages that set the rules nearby.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Gable verge; 2 Valley; 3 Gutters.

Fig. 1 Roof section with Tarrington's three callouts numbered along the water's path.

Callout 1 of 3

Gable verges on Tarrington's framed houses

The verge is where a roof finishes at a gable, and on a framed house it is the point where covering and timber frame meet. The Royal Commission's 1932 inventory describes the monuments it numbers 5 to 42 in Tarrington parish as timber-framed, with roofs that are "tile or slate-covered". A verge on one of those gables is built to suit its covering, so the first question is always what the covering is.

Verges are made in two ways. The older way beds the outer tiles or slates in mortar along the gable edge. The newer way fixes a dry verge unit with a clip or a screw, and BS 8612 is the standard that applies to dry-fix ridge and verge units. Marley's position is that "Installing to BS 5534 isn't required by law", although after the 2015 amendments mortar "could no longer be relied upon as the only means of securing the roof covering". A mortar verge on our work therefore gets a mechanical fixing as well.

A failing verge announces itself from the ground. Mortar lies on the path, tiles sit out of line, and daylight shows between the covering and the wall. Up close we press each unit, rake out loose mortar and look for rain tracks on the face of the gable below. The edge of the covering normally overhangs the gable wall so that rain is thrown clear of it, and a verge that has lost that overhang lets water run down the wall face instead. Inside, the rafter at the gable end is checked for damp, because that is a place where moisture gathers unseen. Below a verge on a framed gable the infill panels between the timbers are checked for cracks, since the water a verge throws clear lands on them. A slate verge and a tile verge are detailed differently, and the report records which one is in front of us.

Beside a timber frame, a repair copies the existing line. The frame under the verge may have moved, and a crisp new edge next to an old curve would only show the movement. We match the bedding to the building and keep the repair in proportion: re-bedding a run of verge leaves the covering on the slope untouched. The report numbers each gable end and records the bedding found, so one gable on a house can be compared with the next.

Our pitched roofing page sets out verges, hips and ridges for slopes of tile and slate.

Mortar or dry-fix?

Does a Tarrington verge have to be dry-fix?

No. Mortar is still used. Marley says mortar as the only fixing can no longer be relied upon to secure the covering, so a mortar-bedded verge also takes a mechanical fixing. A dry-fix verge follows BS 8612. Which suits your gable depends on the covering and the age of the building.

Fig. 2 The verge, drawn close

Callout 2 of 3

Moss and leaves in a Tarrington valley

Think of a valley as the inner corner formed where two slopes run down to meet, so the rain from both arrives in one narrow channel. Leaves drop into it, moss takes hold along its edges, and a channel that should drain starts to hold water against the covering. A valley under overhanging branches fills sooner than one in the open, so the report says what we found and how soon it may need clearing again.

The survey lifts the edges of the covering where it overlaps the valley, looks at the lead or other lining beneath, and photographs the channel along its length. Lead splits at folds and lifts at fixings, and the covering beside it can crack along its cut line. For a pitched valley gutter Royston Lead lists Codes 4 to 8, and the code found goes into the report. Inside the loft we look beneath the valley for stains on the boards and damp on the rafters at both sides. Water from a leak here can travel, so the stain may sit some way from the fault.

At the foot, the valley discharges over the edge of the gutter. The lead there is dressed so that water falls into the gutter and not behind it, and we check that the last course of covering does not choke the outlet.

Moss on the slopes either side deserves a word. Marley, the tile maker, says "The use of high powered jet washes is not recommended as it can damage the surface of the slate or tile". Moss comes off by hand, and a biocide then treats the surface, which helps slow regrowth. Roof cleaning is a separate job, and the debris is bagged and leaves with the other rubbish. Where moss has lifted units at the valley edge, they are taken off, the lead beneath is checked, and the covering goes back with a sharp cut line.

Where lead is sound it stays, and where it has failed along its length a full relay is the answer. A short patch is right only when the sheet around the split lies flat. The photographs show which of the two you have. Our roof cleaning and moss removal page explains how a cleaning visit is done and what a valley needs afterwards.

Checked along a Tarrington valley

  • Leaves and moss packed into the channel
  • Lead split at a fold or lifted at a fixing
  • Covering cracked along the cut line
  • Stains on boards and rafters below
  • How the valley meets ridge and gutter
Fig. 3 The valley, drawn close

Callout 3 of 3

Gutters, soffits and Tarrington's listed cottages

The valley ends in a gutter, and the gutter finishes the water's journey to the drain. Fall, joints, brackets and downpipes are each tested in turn, and we look at the board behind the gutter for softness. Overflow stains on the wall below tell us where the water has been going. A gutter that is only blocked needs clearing, and one that has sagged between brackets needs re-hanging.

The soffit is the board under the overhang. A building built or refurbished before 2000 falls under HSE's rule of thumb, which is to "assume that there is asbestos in it", and its list of locations includes "AIB white soffit panels to underside of roof eaves". Removing asbestos insulating board is generally licensed work, so the licensed jobs pass to a specialist firm. Asbestos cement lifted off carefully and kept whole falls into HSE's non-licensed category. Either way the material goes into a lockable skip, which is what HSE specifies for asbestos.

Tarrington has a good many listed buildings. The Church of St Phillip and St James is Grade II* (list entry 1302745, first listed 6 March 1967). Foley Cottage is Grade II (list entry 1156618, first listed 18 July 1978), as is The Forge Cottage (list entry 1392203, first listed 20 August 2007), and the stables near Brook House are Grade II too (list entry 1302777). Other houses near the village centre have entries on Historic England's list as well. Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 calls for consent when works would touch a building's "special architectural or historic interest", and a replacement gutter or fascia can fall inside that. On a listed cottage the question of cast iron, aluminium or uPVC goes to the council before any change of material, and the profile of the old gutter is matched where consent asks for it.

Whether a church in use is exempt turns on its denomination, so begin with the church's own body. Herefordshire Council publishes the conservation area list, and you can ask it whether an Article 4 direction applies to your address. Building control for Tarrington is Herefordshire Council Building Control, on 01432 261938, with a registered building control approver as an alternative. Our guttering, soffits and fascias page covers replacement and rainwater goods.

A gutter at the eaves

SoundGutter holds its fall and drains cleanly to the downpipe
Needs workSag between brackets, standing water, stained wall below

Tarrington roofs: verges, moss, gutters and listings

How do I tell whether a Tarrington gable verge has lost its grip?

Look from the ground for mortar on the path, tiles or slates out of line along the gable, and daylight between the covering and the wall. Rain tracks down the gable face are another sign. A verge that has lost its bed can be re-bedded and fixed without disturbing the slope behind it, and the report shows the stretch concerned with photographs and a position along the gable.

How is moss cleared from a Tarrington roof?

By hand, followed by a biocide treatment. Marley calls high powered jet washes "not recommended" for slate or tile. Checkatrade's April 2026 guide puts hand-removal with biocide at around £11.50 per m², within a general roof cleaning range of £8.50 to £14 per m². Those are per m² figures from a third party, not a total, and our price is one written sum after the survey.

Does a re-tiled Tarrington roof need approval from building control?

In England the Planning Portal sets two limits, 25 per cent of the building envelope and 50 per cent of the roof, and work below both normally needs no application. A larger re-tile goes to building control. If insulation is added, Part L applies: AD L 2021 Table 4.3 gives 0.35 and an improved 0.16, then AD L 2026 Table 3.3 from 24 March 2027.

With listed buildings round Tarrington, what applies to my house?

Check the list for your own address first, because each house in Tarrington has its own entry or none. A listed house requires consent before work that changes its character, as well as any planning permission, so settle the consent question before a date is booked. Separately, ask Herefordshire Council about its conservation area list and about Article 4 directions, since neither can be assumed for you.

What does scaffold on a Tarrington road need?

A licence is needed under section 169 of the Highways Act 1980 once scaffolding blocks a road or pavement. Herefordshire Council charges £167 per licence, for a period of at most one month, and £123 for every month added. Applications must be in at least 10 days beforehand, so the date is set early. We arrange the licence with our scaffolder. A main through road at a Tarrington house is raised with the council before booking.

What happens if the soffits on a Tarrington house contain asbestos?

We stop and treat it as asbestos until tested. Insulating board soffits generally count as licensed work, which a licensed firm handles. Under HSE's list, asbestos cement removed with care and left unbroken is non-licensed work. HSE wants asbestos waste kept in a lockable skip, and that is where ours goes. Householders can take small amounts to Hereford's recycling centre, double bagged and booked in advance, as residents only.

A Tarrington survey from gable to gutter

Tell us which edge worries you, the gable, the valley or the gutter, and send a photograph if you can.

10-year workmanship guarantee, in writing