01432 610152 Get a quote Call 01432 610152

Roofers in Shobdon

Roofing in Shobdon, a village 19.7 road miles north-west of Hereford.

A survey here starts with the topmost row of tiles. Photographs of every fault come with a total price in writing, one figure only.

Get a free quoteCall 01432 610152

Timber frames, tile and listed neighbours

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Frames from the 1600sGaps at the verge and eaves, where covering meets old timber, let rain in.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Slipped slates, cracked tilesA loose slate or cracked tile leaves the battens and underlay open to rain.
  • Newer homes with grey concrete tile roofs along a curving estate road
    The Rhos and Bateman ArmsBoth carry Grade II listings, so roof changes there need consent first.

Shobdon in our service area

Shobdon on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

A Shobdon roof, read from tile line to timber

Reading a Shobdon roof from the ridge tiles to the old timber frame

The Shobdon survey follows set stages: first the ridge and its capping, next the valley lines where two slopes of rain gather, and finally the timber-framed walls and listed neighbours, where the rules tighten.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Ridge top; 2 Valley lines; 3 Frame and listings.

Fig. 1 A border house cut open, with the ridge, valley and frame numbered for Shobdon.

Callout 1 of 3

The ridge over Shobdon's tile and slate

We begin at the highest point. A Shobdon ridge is a row of capping tiles over the seam where the two main slopes join, either laid on a mortar bed or held with clips and screws. In 1934 the Royal Commission on Historical Monuments gave monuments 3 to 23 in Shobdon parish a single description, unless an entry said otherwise: buildings of the 17th century, two storeys high, timber-framed, with "tile or slate-covered roofs". Over ninety years have passed since that note was made, and only a close look at your ridge shows what the house wears now.

From one gable end to the other, we press down on the capping with a gloved hand. A tile that shifts has lost its bed. Hairline cracks in the bedding admit rain under the cap and into the top course, then down to the battens (thin laths of timber that hold each course in place). A hip, the sloping outer edge on which a ridge ends, is where two slopes part company; its joints take rain from two directions, so each one gets a second look.

On fixings, Marley's advice is direct: installing to BS 5534 "isn't required by law", yet the 2015 amendments ended mortar as the sole means of holding a covering down. BS 5534 governs slating and tiling, and BS 8612 covers dry-fix ridges. On a house built to be bedded, we put a mechanical fixing in beside the mortar and keep the traditional look, so the ridge reads from the lane as it always has.

Our report names each tile or joint that needs work, shows it in a photograph and says whether a repair will hold. Wherever mending will serve better than renewing, the report states that plainly. A loose ridge is a repair job and nothing more. If the entire covering is spent, remember that Shobdon sits in England, where the Planning Portal puts two questions to you: is less than 25 per cent of the building envelope affected, and is less than 50 per cent of the roof? Inside both limits, an application is not normally expected of you. If a new covering increases the weight by 15 per cent or more, approval is needed, after a structural check of the timbers. Our roof repairs hub covers the smaller jobs.

Ridge checks before any tile is lifted

  • Capping tiles that rock or sit proud
  • Mortar joints cracked or crumbling
  • Fixings holding each capping tile
  • The junction where ridge meets hip
  • Gable-end tiles and their bedding

From the lane a ridge looks sound; up close, the bedding tells the real story.

Fig. 2 The ridge, drawn close

Callout 2 of 3

Valleys where two Shobdon slopes meet

Callout two is the valley, an inward fold where one slope runs into another and both shed their rain into the same channel. A house with a cross-gable or a rear wing has one, and that narrow channel carries far more run-off than a plain stretch of slope. Some valleys are lined in lead; the alternative is a valley built from tiles shaped to the angle over a concealed lining. Both kinds tend to fail along the edge, where covering meets lining.

The valley is followed from the top end to the gutter at the bottom. A split along a lead fold, an edge that has lifted, or a bank of leaf litter and moss in the channel: those are what we look for. Boards under the valley are examined from the loft, since a brown stain that lines up with the valley says more than any view from the road. If you can see a dip or a green smear along the valley from the lane, mention it when you book. Royston Lead's table gives Codes 4 to 8 for pitched valley gutters, and Code 3 is "Recommended for lead soakers only", so thin Code 3 sheet is not what a valley wants. The code is picked to match the length and span of the run.

Debris comes out by hand, with a photograph before and another after. We do not blast a roof clean. Marley, the tile maker, advises against jetting a roof at high power, because it can scar slate or tile and cut short its expected life. Where a lining has failed over its whole length we recommend renewal and show you why. Where one split is the only fault, a repair gives you more for your money, and the report recommends that instead. If the valley cannot be reached from a ladder, the quote you receive already contains the scaffold.

The same walk includes the lead where the valley meets a wall or a chimney. MyJobQuote states that correctly installed lead flashing "can last for over 80 years", so sound lead stays and failed lead is replaced with new sheet instead of being smeared with sealant. Our lead roofing page describes the metalwork we fit.

What we read in a valley, from top to gutter

Lining
Lead or tile over a hidden lining, checked for splits
Channel
Cleared of moss, leaf litter and loose mortar
Edge laps
Covering cut tight and lapped over the lining
Boards below
Checked from the loft for stains and soft timber
Bottom end
Where the valley empties into the gutter
Fig. 3 The valley, drawn close

Callout 3 of 3

Timber frames, listed neighbours and the council's lists

Callout three stands where a timber-framed gable meets the covering. At the gable the covering ends in a verge, its sloping edge, which sits against timbers that have shifted for centuries, so a crack can open between tile and wood. We look for daylight along that edge, for bedding that has fallen away and for dark streaks on the timber face. Photographs of the verge are taken square-on and from an angle, so the width and depth of any gap are both visible to you. From the loft we also trace the wall plate, the timber that carries the rafter feet, since an old frame shows damp at that timber before any ceiling stains. The repair is made from materials sympathetic to the house, so the finished work moves with the frame.

Among Shobdon's listed buildings are The Rhos (list entry 1166613) and the Bateman Arms (list entry 1349764), both Grade II and both first listed on 9 December 1986. Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 makes consent a legal requirement for alterations touching the special interest of a listed building. A listed house retains its permitted development rights, yet the works still need consent in their own right; materials and method are agreed with Herefordshire Council ahead of the first tile coming off. Our listed and heritage roofing page explains how we treat protected houses.

Herefordshire has 64 conservation areas. To learn whether your lane lies inside one, consult Herefordshire Council's own conservation area list, and ask the council whether an Article 4 direction applies at your address. Either can limit what you may alter on the visible face of a roof. Dormers and new windows in the slope run into the tightest rules, and our planning guide for roof windows sets them out in full.

Building control for a Shobdon address is Herefordshire Council Building Control, at Plough Lane in Hereford: 01432 261938, or bce@herefordshire.gov.uk. You may appoint a registered building control approver in its place. Whichever route you take, we take pictures of the roof at the start and again at handover, so the file holds a picture of each stage.

On an old frame, the verge shows where the building has moved.

Gable verge on a framed wall

SoundVerge bedded firm, with no daylight between tile and timber
Needs workDaylight at the verge, loose bedding, dark staining on the wood

Shobdon roofs: frames, listings and licences

What roofs did the 1934 survey find on Shobdon's older houses?

Monuments 3 to 23 in Shobdon parish were described in the Royal Commission's 1934 inventory of Herefordshire, unless an entry said otherwise, as two-storey, timber-framed houses of the 17th century roofed in tile or slate. Coverings are renewed down the centuries, so that is a record of what was seen then, not of what your house wears now. Going down from the ridge, the survey gives each fault its own photograph, and we say whether a repair will do before a renewal is priced.

Does a listed house in Shobdon need consent just to replace a few tiles?

That depends on the work and the building. The Rhos and Bateman Arms both carry Grade II list entries (1166613 and 1349764). Section 7 of the 1990 Act requires listed building consent for alterations that touch a building's special interest. Patching with matching tiles and changing the covering are separate questions, so ask Herefordshire Council before work begins. A listed house holds on to its permitted development rights, yet its owner still has to obtain consent.

When does re-covering a Shobdon roof need an application?

Shobdon is in England, where the Planning Portal's guidance has two limbs: less than 25 per cent of the building envelope, and less than 50 per cent of the roof. Work under both limits would normally go ahead without an application, while anything bigger goes to building control. If insulation goes in with the new covering, Part L applies: until 24 March 2027, AD L 2021 Table 4.3 sets a threshold of 0.35 and an improved figure of 0.16.

How can I tell whether my Shobdon street is in a conservation area?

Herefordshire has 64 conservation areas, and the council holds the list and the boundaries. Look up your address on Herefordshire Council's own conservation area list before altering the roof's appearance, and ask whether an Article 4 direction applies. Either answer can change your options. Mending in matching tiles is judged one way and a new roof window another, and the windows are covered in the planning guide we link from this page.

Will scaffold at a Shobdon house need a highway licence?

Only when it stands on the highway, where section 169 of the Highways Act 1980 requires one. Herefordshire Council's fee is £167 for a maximum of one month, £123 for each further month. The application must reach the council at least 10 days before erection. We arrange the licence with our scaffolder, and the scaffold is part of the quote you sign. Highways Licensing is on 01432 261800. National Highways, rather than the council, is responsible for motorways and trunk roads.

Does Herefordshire Council or a private firm check a Shobdon re-roof?

Either can. Herefordshire Council runs its own building control service from Plough Lane in Hereford, on 01432 261938 or bce@herefordshire.gov.uk. A registered building control approver can inspect the work instead, and the choice is yours. At the survey we tell you whether your job is likely to need an application at all, so you know which office to approach before anything is booked.

Send us your Shobdon roof, ridge first

Say what shows from your gate or garden, attach a photograph if one exists, and a survey date follows.

10-year workmanship guarantee, in writing