Callout 1 of 3
Where a later wing meets the older roof
The Victoria County History's 2010 account of Pauntley says that at Pauntley Place, formerly the White House, a 19th-century brick wing was added "to recreate an L plan and painted to imitate timber framing". That is one house, and it says little about the rest of the parish. It does show what an added wing does to a roof. The plan turns into an L, the covering has to run across the join, and a valley forms where the two slopes meet. A valley is a V-shaped channel, and every drop from both slopes finds it on the way to the gutter.
Since a valley collects from two slopes together, an L-plan house gets its valley checked before anything else. We look along the lining, at the cut tiles or slates banked up on both sides, and at the gutter below. Royston Lead's table sorts sheet lead into codes by thickness. Codes 4 to 8 all list pitched valley gutters among their uses, whereas Code 3 is "Recommended for lead soakers only". Lead that has creased along a fold or split beneath packed moss is cut out and renewed, and a coat of sealant is never laid over the damage.
Where the wing's roof ends against the older gable wall, the seal is a flashing: lead pushed into a brick joint, then dressed down across the tiles. Beneath it, folded lead pieces called soakers are slipped under each course. On a join made long ago, the mortar joint can open before the lead has worn out. MyJobQuote says correctly installed lead flashing "can last for over 80 years", which is a hedge about flashings in general and no promise for one wall. From the loft we follow a ceiling stain back up its rafter to the valley or flashing above, because a mark on plaster can sit a long way from its cause.
Re-covering the whole wing is another matter from patching it. The Planning Portal gives England a two-part test. Under it, "Less than 25 per cent of the total 'building envelope'" and "Less than 50 per cent of the roof" must be affected at most, for no application to be normally needed. A renovated roof is held to AD L 2021 Table 4.3 (threshold 0.35, improved 0.16) until AD L 2026 Table 3.3 takes over on 24 March 2027. See lead roofing for the way a failed valley is stripped and lined afresh.
Checked along an L-plan valley
- Lead lining for splits, creases and lifted edges
- Cut tiles or slates banked beside the channel
- The gutter at the foot of the valley
- The flashing where the wing meets the older wall
- Ceiling stains traced back through the loft
On an L-plan house the valley takes rain from both slopes, so it is the first line we walk.