01432 610152 Get a quote Call 01432 610152

Cancelling urgent work

Can I cancel an urgent roof repair?

Cancelling a roofing job normally gets you 14 days. An urgent repair you phoned for is the exception, so know where you stand before you agree.

Short answer

Not as of right. Regulation 28(1)(e) of the Consumer Contracts Regulations 2013 takes away the cooling-off period when you personally asked the trader to visit for an urgent repair. That is true on both sides of the border. A roof job agreed after a survey, with no urgency behind it, still carries the 14 days, and your right to proper workmanship stays in place either way.

Where the 14-day right comes from and where it stops

The Consumer Contracts Regulations 2013 give you a cancellation period when a contract is made away from the trader's own premises. Regulation 5 treats a contract made with both of you in the same room, somewhere other than the trader's business address, as one of these, which takes in your own front room after a roofer has surveyed the house. For a service, regulation 30 ends the period 14 days after the day you enter into the contract.

Regulation 28(1)(e) then removes one case from the scheme. If you specifically asked for the visit so that urgent repairs or maintenance could be carried out, the cancellation right does not apply. Citizens Advice explains it as no cooling-off period where you let a firm into your house to deal with urgent repairs or maintenance.

Everything turns on who started the visit. When a trader calls unannounced and you agree to a job, you did not ask for an urgent visit, so you keep the 14 days. When you ring because water is coming through the ceiling, you did ask. The regulations are UK-wide, so the position on a Monmouthshire doorstep is the same as on a Herefordshire one.

What counts as urgent and what does not

Neither the regulation nor Citizens Advice supplies a list, so there is no neat boundary. The wording points at the reason behind your request. A leak coming in tonight, a slate through the conservatory roof or a chimney pot hanging over the path sounds urgent. A tired ridge you have been meaning to get looked at, or a quote for a new roof next spring, does not.

That matters because a single call-out can lead to two kinds of work. A make-safe job you rang about in a storm is the urgent part. A larger re-roof that we survey afterwards, price separately and that you agree to at home on a later date is a new contract, and the 14 days apply to that one.

Keeping the two apart on paper protects everyone:

  • The first document describes the urgent repair, what was done and why it could not wait.
  • The second describes any later, planned work, with its own total price.

If you are unsure which of the two you are being asked to sign, say so before you sign. A clear answer from the trader is a good sign in itself.

If you change your mind before work starts

With no statutory right to cancel, you fall back on the terms agreed between you. Read them before you accept: how much notice is needed, whether the visit carries a charge, and what happens to anything already ordered. We put the scope of work and the total price on paper so both sides can see what was settled.

A call-out to make a roof safe is carried out on the spot, so by the time it ends little may be left to cancel. Where it can still be called off is before the work begins, and we would rather you phoned to tell us than left us standing at the door. A permanent repair that follows the make-safe is a separate decision. You can take your time over it, get another view or say no.

Should you want a normal off-premises job to begin inside the 14 days, regulation 36 asks that the request comes from you on a durable medium, which in practice means in writing. A text message or an email qualifies. A spoken yes on the doorstep does not.

The urgent-repair exception has no such form, because it depends on how the visit came about.

Your protection if the work goes wrong

Losing the cooling-off period does not leave you without a remedy. Section 49 of the Consumer Rights Act 2015 demands reasonable care and skill of whoever does the work. That covers an urgent make-safe as much as a re-roof, in England and in Wales.

A few habits make a disagreement easier to settle later:

  1. Have the job described and priced on paper before it starts, even on a wet night.
  2. Ask for photographs of the fault before and after the work.
  3. Keep the invoice and any messages.

If a complaint stays unresolved, the Citizens Advice consumer helpline is 0808 223 1133, and 0808 223 1144 reaches an adviser who speaks Welsh. As for formal dispute schemes, the 2015 alternative dispute resolution regulations were revoked on 6 April 2026. The duty now sits in section 308 of the 2024 Digital Markets, Competition and Consumers Act: a trader has to point you to whatever dispute arrangement exists if you are unhappy with the outcome.

For the repairs themselves, see roof repairs, and for what a make-safe involves, making a roof safe after damage.

Related questions

What if I ring a roofer, then decide I do not want the work?

Tell the roofer straight away, in writing, before anything is started. With no cooling-off right, the outcome rests on the terms you agreed, which is why the scope and any charge for the visit belong on paper. If it cannot be settled, ring the Citizens Advice consumer helpline on 0808 223 1133.

Does a quote for a permanent repair after a make-safe get 14 days?

If you agree to it after a survey at home, provided you did not request that later visit as an urgent one, the 14 days apply. To have it begun sooner, make that request in writing. The make-safe you phoned about on the night is dealt with separately, under regulation 28(1)(e).

Get your free roof quote

Tell us about the roof and we will arrange a survey.

10-year workmanship guarantee, in writing