In brief
It depends on the roof, so a single time would mislead. A small roof with one clear slope takes less time than a large one with several chimneys, valleys and a flat extension. Time also goes on the loft, on photographing each fault and on talking through the findings with you. The cost of any repair is put in writing after the survey, never on the doorstep.
What sets the length of a visit
Surveyors do not work to a stopwatch, because the roof sets the pace. A bungalow with a plain gable and one stack is a shorter job than a farmhouse with a stone-tiled wing, a timber-framed gable and a rear extension, and both can be in the same lane. Each feature in the table adds a stop, a set of photographs and a note, so the time grows with the list of things to look at, not with the size of the house alone. A big roof with a plain covering and no chimney can take less time than a small one with three stacks and a lead valley.
| Feature | Why it takes longer |
|---|---|
| Several roof levels | Each needs its own view |
| Chimneys and valleys | Flashings need a close look |
| Flat extension | Membrane and edges to check |
| Awkward access | Ladder moves, gates, neighbours |
| Loft included | Entry, torchlight, timbers |
Weather also plays a part. Wet slates are not safe to approach, and a strong wind stops a ladder or a drone going up. A visit postponed for the weather is a short delay and a safer survey, and the photographs are clearer in dry light as well.
In the order we work, from the skyline down
The sequence is the same on every roof, which is why the time on a given house is easy to explain afterwards. We begin high, because the ridge and the verges are the roof's outline against the sky, and the places wind works at first.
- The ridge, hips and verges, for loose pieces and failing mortar.
- The chimney stack, its flashings and the flaunching round the pots.
- The valleys, for silt, lining and the cuts where the slopes meet.
- The slopes, tile by tile or slate by slate, for slips, cracks and gaps.
- The eaves, with the gutters, fascias and soffits beneath them.
- The loft, if it is part of the survey, from the hatch inwards.
Photographs are taken as we go, so each fault is recorded where it sits. A fault that needs a second look, such as a stain under a flashing, gets extra time. A roof in good order moves faster than one with a long list, since each fault means a stop, a close photograph and a note of where it sits. We would rather spend the extra time on a flashing that looks wrong than move on and leave you with a gap in the report.
Photographs, notes and the write-up
The visit is not the end of the work. Photographs have to be sorted, matched to the position on the roof and checked, and the findings written in plain words. A basic visual inspection can end with the photographs and a short summary. A fuller survey ends with a written report, and the report adds time after the visit.
This is where depth shows. A short look gives you a general impression. A longer one gives you pictures you can use: with a fault named, placed on the roof, and set beside the repair that suits it. If you want the evidence for an insurer, the detail matters more than speed, because when the Financial Ombudsman Service reviews a storm complaint it says it will usually look at expert reports and photos of the property.
We show you the photographs when we finish if you are home, or send them by message afterwards if you are not. The question of being home for a survey covers what to arrange, and what a roof survey report covers shows what the write-up contains.
What happens after the visit
The time a survey takes is separate from the time before work begins. Once the visit is over, you get a price on paper, as a sum covering whatever the survey turns up, and nobody is rushing you to accept it. Sign at home and the Consumer Contracts Regulations 2013 give you 14 days to cancel, a right that holds in both England and Wales. Asking for work to start sooner has to be done in writing.
Some roofs need approval before work starts, and that takes time of its own. The two countries test it differently:
- For an English house, the Planning Portal puts the threshold at 25 per cent of the building envelope and 50 per cent of the roof; staying below both normally means no application.
- For a Welsh house, gov.wales says a re-roof will in most situations call for Building Regulations approval.
Cost guides give a sense of what comes next. MyJobQuote's average roof survey is around £300, with a basic visual inspection at £100 to £200 and a full survey at £250 to £400. The roof inspections page describes the whole service.