01432 610152 Get a quote Call 01432 610152

Roofers in Bosbury

Ridge, eaves and listed walls on Bosbury's timber-framed houses, checked from the skyline downwards.

You see photographs of every fault found on your roof, and the report ends with one total price in writing.

Get a free quoteCall 01432 610152

A Bosbury roof read from skyline to tower

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Ridges that have lost their bedCapping tiles loosen as the mortar under them cracks, and rain reaches the battens.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Eaves beside a moving frameTimber frames shift, and gutters and eaves timbers show it first.
  • Newer homes with grey concrete tile roofs along a curving estate road
    A Grade I church and towerListed church roofs follow a consent route that depends on the denomination.

The Bosbury area

Bosbury on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Bosbury roofs from the ridge to the tower

Reading a Bosbury roof from ridge to frame to church wall

The survey on a Bosbury house runs top to bottom: the ridge line, then the eaves and gable where a timber frame meets the covering, then the listed church, bell tower and houses whose consent routes shape any repair.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Ridge; 2 Framed eaves; 3 Church wall.

Fig. 1 Ridge, framed eaves and church wall marked 1 to 3 on the section drawing.

Callout 1 of 3

Ridge capping on a Bosbury house

The ridge is the line on which a Bosbury house meets the sky, so it is the first place the survey looks. Capping tiles run along it, set either in a bed of mortar or on dry-fix clips and screws. The Royal Commission's 1932 inventory puts the parish's monuments 8 to 58 in the 17th century and describes them, unless it says otherwise, as timber-framed and two-storeyed, with "tile or slate-covered roofs". Each covering has a ridge capped and fixed to its own method, and a house re-covered after 1932 may carry something else again.

We walk the ridge from end to end and lean a hand on each capping tile, checking for any that shifts under it. Where mortar has gaps, rain can reach the top course and the timber battens carrying it. A hip is the corner where two slopes meet at an outward angle, and where it joins the ridge the tiles from three directions come together, so that junction is examined twice. Inside the loft, the underside of the ridge gets a look too, where daylight showing through the line, or crumbs of white mortar on the underlay, mark a bed that has failed.

Marley, the tile maker, says that "Installing to BS 5534 isn't required by law", yet mortar alone has not been enough since the 2015 amendments. Dry-fix systems built to BS 8612 answer that with mechanical fixings. Mortar keeps its place on a Bosbury ridge where the house calls for a bedded finish, provided each tile is also held by a fixing.

Should the survey show the whole covering is spent, England's Planning Portal test decides the paperwork. An application stays unnecessary, in its word "normally", only while less than 25 per cent of the building envelope and less than 50 per cent of the roof is affected. Whatever lies beyond that is passed to building control first. We put what the photographs show in front of you before a replacement is mentioned, because a ridge fault on its own never justifies one.

Re-bedding a ridge is repair work and is priced as repair work. Access is by ladder or by a tower set up on the garden side, whichever the roof allows, and the cost of that sits in the one written total. Our roof repairs page sets out the smaller jobs that start at the ridge.

A loose capping tile

Is a loose ridge tile a reason to re-roof?

No. A loose or open ridge is repaired by re-bedding or re-fixing the capping, and the photographs of the slopes show whether the rest of the covering is sound. A re-roof is raised only when the survey shows the covering itself is spent.

Fig. 2 The ridge, drawn close

Callout 2 of 3

Where a Bosbury timber frame meets the eaves

Where the walls are timber-framed, the roof does not simply sit on a wall. It rests on a wall plate, the long beam laid along the top of the frame, and the rafter feet are fixed to that. Frames shift, settle and dry out, and each movement shows at the eaves and the gable before it shows indoors. That is why the second callout sits at the point where the covering stops and the frame begins. Inside the loft we examine the rafter feet, where the rafters meet the plate, for softness or staining.

At the eaves we look at the gutter as well as the tiles. Brett Martin's installation advice is a fall of 1mm for every 600mm of run, so that water drains to the downpipe. A gutter that sags holds water against the fascia and the eaves timbers instead. Staining on the timber below the eaves tells us where water has been running down the frame, and photographs from the ground and the ladder go into the report together.

Repairs beside a frame cannot be rigid. A tile or slate fixed hard against a post that moves will crack. Flashings are cut for the individual joint, and lead is dressed to allow for movement. If a rafter foot or the wall plate is soft, the photographs show it and we recommend a carpenter's opinion before any covering goes back on top. Sealant in a gap covers movement without stopping it; the joint is opened up and made good instead.

At the gable, the verge rests on the same moving timber. Mortar bedding cracks along the join with the frame, and where it has dropped out the verge is re-bedded and clipped, with BS 8612 dry-fix verge units as one option. We also look at the first tile or slate inside the gable for cracks, because a frame that has moved leaves its mark there.

When a whole slope beside a frame has to come off, our pitched roofing page describes how it is stripped, repaired and relaid. The courses are relaid in the material the house carries now, and if that is not the original covering, the survey says so.

Eaves beside a timber frame

SoundEaves dry, timber clean, gutter falling to the outlet
Needs workStaining below the gutter, damp timber, water held in the run

Where a frame moves, the roof beside it has to move with it.

Callout 3 of 3

Holy Trinity, the bell tower and Bosbury's listed houses

Holy Trinity church is listed Grade I (list entry 1098890, first listed 6 March 1972), and the Bell Tower has its own Grade I listing (list entry 1349189, first listed 26 March 1986). Holy Trinity is Church of England property, so with worship ongoing in the building, roof work on it runs through the faculty jurisdiction and not through council listed building consent. United Reformed, Methodist and Roman Catholic buildings in use share the exemption, as do Baptist Union chapels a Schedule 1 trust corporation holds, but not Quaker or Unitarian meeting houses or any church that has closed; those go to the council for listed building consent.

Bosbury's listed houses sit under the ordinary rule. The Grammar School is Grade II (list entry 1349164, first listed 18 November 1952), and Dog Farmhouse is Grade II (list entry 1156903). Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 makes listed building consent necessary for work that affects a building's character, and permitted development stays in place beside it. Herefordshire Council is asked before materials are bought, and our listed and heritage roofing page describes the steps from first photograph to final dressing.

Herefordshire Council's designation dates give the Bosbury conservation area as designated in 1976. The county has 64 conservation areas, and the council keeps each map. Adding a roof window or a dormer is a planning question of its own, and our planning guide for roof windows covers it. Check whether an Article 4 direction applies with Herefordshire Council. Inside the conservation area, a repair in matching material is ordinary maintenance, and the before and after photographs go into your file. A different tile colour or a new roof window changes how the street looks, and the council hears about it before anything is ordered.

Building control for a Bosbury address is Herefordshire Council Building Control, on 01432 261938 or at bce@herefordshire.gov.uk, with a registered building control approver as the other option. Bosbury is 15.6 road miles east of Hereford, about 25 minutes by road, so the visit is a short drive for us and an unhurried one for you.

Words on a listed Bosbury roof

Faculty
The Church of England consent system for church buildings in use
List entry
The number under which a building appears on the national list
Permitted development
Work that needs no planning application, within set limits
Registered approver
A private firm registered to do building control work

Bosbury roof questions answered

How does a timber frame change the way a Bosbury roof is repaired?

Frames move, so the repair has to allow for it. Flashings are cut to the individual joint, lead is dressed so it can shift without tearing, and tiles are never fixed hard against a moving post. The survey also looks from the loft at the wall plate and rafter feet, because damp may show there before a ceiling stains, and the photographs go in your report.

Which route covers roof work at Holy Trinity church in Bosbury?

Holy Trinity is listed Grade I under list entry 1098890 and sits within the Church of England. While worship continues, a roof repair is put through the faculty jurisdiction, and council listed building consent is not the route. The separately listed Bell Tower, list entry 1349189, is a Grade I record of its own, so the church authorities are asked how it is covered before any work is planned.

Do listed houses such as the Grammar School and Dog Farmhouse need consent for re-tiling?

Both are listed Grade II. Re-tiling a listed house can affect its character, which puts it under section 7 of the 1990 Act and means listed building consent as well as any permitted development you hold. Herefordshire Council is asked first, with photographs of the existing covering and the proposed one, so the choice of tile, fixing and method is agreed before ordering.

What are the rules for new roof windows in Bosbury, a conservation area designated in 1976?

Herefordshire Council's list gives Bosbury as designated in 1976, and the council holds the boundary, so the exact line of your street is a question for the council's map. Roof windows and dormers are planning questions with their own conditions, which our planning guide sets out. Check whether an Article 4 direction applies with Herefordshire Council, since a direction removes permitted development rights that would otherwise apply to your street.

When does a heavier covering need Building Regulations approval in Bosbury?

Approved Document A says a significant change in roof loading is an increase of more than 15%. A switch from a light covering to a heavy one can cross that line, and a structural check on the roof comes before approval is given. This is a Building Regulations question, not a planning one, and Herefordshire Council Building Control or a registered approver answers it for your address.

What does a scaffold licence involve for a Bosbury house?

Scaffold on a road or pavement is licensed under section 169 of the Highways Act 1980. We arrange the licence with our scaffolder. Herefordshire Council charges £167 for a maximum of one month, £123 per month if the Bosbury job runs on, and needs at least 10 days' notice. Name a busy road at the Bosbury visit, and the council is asked. The quote already includes the scaffold.

Start a Bosbury roof survey with a photograph

Send a picture of the ridge, the eaves or the part that worries you, and a survey visit follows.

10-year workmanship guarantee, in writing