Welsh consent

Who gives listed building consent in Wales?

The local planning authority: the county council, or the National Park Authority inside Bannau Brycheiniog. The law behind it is the Historic Environment (Wales) Act 2023.

In brief

In Wales, listed building consent comes from the local planning authority, which is the county council or, within Bannau Brycheiniog, the National Park Authority. Section 88 of the Historic Environment (Wales) Act 2023 says a person "must not carry out works to which this section applies, or cause such works to be carried out, unless the works are authorised under section 89". Section 89 is listed building consent, and section 88 has been in force since 4 November 2024.

What the 2023 Act asks for

Part 3 of the Historic Environment (Wales) Act 2023 deals with buildings of special architectural or historic interest. Section 88(2)(a) catches an alteration or extension to a listed building that changes its special interest, and section 88(2)(b) catches demolition. For a roofer, the first limb is the one that matters, since re-covering, rebuilding a stack or altering a verge can each be an alteration.

The Act took over from the earlier Welsh arrangements on 4 November 2024, so a Welsh address now follows the Welsh Act, and any older guide quoting a pre-2024 section number should be treated with care. Section 117 makes carrying out unauthorised works an offence, which is why consent comes before the scaffold goes up and not after.

Two kinds of building sit outside section 88, and both are worth checking before you assume the council is the right door. A building that is a scheduled monument has its own consent, run by the Welsh Ministers. An exempt religious building in use, such as a Church in Wales church, follows its denomination's own system. Our other Welsh guides cover both, and neither is a reason to skip the question of which applies to you.

Who the planning authority is on the Welsh side

The explanatory notes to the Act speak of listed building consent "from the local planning authority". For most Welsh addresses near Hereford, that is the county council. Inside Bannau Brycheiniog, the National Park Authority is the planning authority, while building control stays with the council in both cases.

Where to ask in Wales
QuestionAsk
Is my house listed?The council, or the Park Authority in the Park
Do I need listed building consent?The same planning authority
Is a monument scheduled?The Welsh Ministers, who keep the schedule
Is the church exempt?The church body, checked against the 2024 Regulations
Building Regulations for the roof?The council's building control or a registered approver

In Monmouthshire, the county council's Duty Planning Officer is the contact when you are unsure whether you need planning permission, on 01633 644831. A Powys address goes to its own council instead, and a written answer from either is worth having before an application is drawn up. Note the name of whoever replies and the date of the reply, as both help later.

Roof jobs that bring consent into play

What counts is how far the work alters the building's character; the size of the job does not settle it, and a small change can matter more than a large one. A few replaced slates in the same material and the same bond may sit differently from a change of covering, a new rooflight or a rebuilt chimney. Our guide to like-for-like repair looks at where the line tends to fall, and the planning authority decides for your building.

Work that normally starts a conversation with the planning team includes:

  • stripping and re-covering a slope
  • changing from one covering to another
  • altering a ridge, a verge or a parapet
  • taking down or rebuilding a chimney stack
  • cutting in a roof window or a rooflight
  • adding or replacing a dormer cheek or a gable end

A listed house keeps its Class B and C permitted development rights but also needs consent. Roof lights are not permitted development on article 1(5) land, which takes in conservation areas and National Parks, so the planning authority should hear about any rooflight before it goes in.

How we prepare an application

Consent comes more readily when the application describes the roof as it is. We survey from the roof as well as from the ground, and we photograph every defect, starting at the ridge and coming down to the eaves. The pictures show the planning authority what the repair answers, and which parts are sound enough to stay, and the next person to repair the roof will thank you for the record.

Before any application is lodged, we:

  1. confirm the list entry and its grade
  2. agree the repair method and the covering with the owner
  3. ask the planning authority what it expects the application to contain
  4. hold back any stripping until the decision is in, even when the weather presses

For a church or chapel, the exempt list comes first, and our guide to chapel and church roofs in Wales covers it. Our listed and heritage roofing page explains how a survey is carried out and what it records. The quote that follows is one figure in writing, and you can ask that it names the scaffold and VAT position.

Related questions

Does the Welsh Government grant listed building consent?

Not as a rule. Applications go to the local planning authority, which is the county council or the National Park Authority. The Welsh Ministers hold other functions under the 2023 Act, including scheduled monument consent. Ask your planning authority which body decides the particular work you have in mind, and get the answer in writing.

Can I apply for consent after the work is done?

Doing the work first is risky, because section 117 of the 2023 Act makes carrying out unauthorised works an offence. Ask first, and wait for the decision. Our guide to unauthorised works to a listed roof sets out what follows if work has already started without consent, and how a council tends to respond.