A scheduled monument is a protected site recorded on the national schedule, and the law treats work to it differently from work to an ordinary listed house. If a roof forms part of the monument, or a monument stands where a scaffold, a skip or a ladder needs to go, the usual habits of a repair job do not apply. Start by finding out whether the site is scheduled, then who gives consent.
The answer depends on which side of the border the building stands. England's law is the Ancient Monuments and Archaeological Areas Act 1979, and the consent is the Secretary of State's to give. Wales has the Historic Environment (Wales) Act 2023, with the decision resting on the Welsh Ministers. Horizon Roofing Hereford works on both sides, so this guide takes each route in turn. It sits alongside the rest of our listed and heritage roofing work.
Where a site is scheduled, our survey photographs and a plain written description of the repair are the material a consent application is built from. That is why we photograph the roof and the monument together before anything is touched.
Why scheduling is not the same as listing
Listing and scheduling are separate protections with separate Acts. A listed building is controlled through listed building consent: in England under section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990, and in Wales under sections 88 and 89 of the 2023 Act. A scheduled monument is controlled through scheduled monument consent. A building can carry one protection, the other or both, so the two can meet. In Wales, section 88(3)(a) of the 2023 Act says the listed building rule does not apply to works in relation to a building which is a scheduled monument.
So the first question on an old site is whether any part of it, or anything standing in its grounds, is scheduled. If the building itself is scheduled, its roof work needs scheduled monument consent. If only a churchyard cross or similar monument stands beside the roof, consent covers works to that monument and tipping on its land, so the roof job still has to keep clear of it.
| Side of the border | The law | Who gives consent |
|---|---|---|
| England | 1979 Act, section 2 | The Secretary of State |
| Wales | 2023 Act, sections 13 and 14 | The Welsh Ministers |
Neither route runs through the local council, and neither is a planning permission. The council's conservation or planning team can help you check, so ask it rather than judging by the look of the building.
England: section 2 of the 1979 Act
In England, section 2 of the 1979 Act makes it an offence to execute, cause or permit works to a scheduled monument unless the works are authorised under that Part of the Act. The works it names include any that demolish, destroy or damage the monument, any "for the purpose of removing or repairing a scheduled monument or any part of it or of making any alterations or additions thereto", and flooding or tipping on land where a monument lies.
In England, the authority is a written scheduled monument consent, granted by the Secretary of State, and the works must follow its terms and any conditions. Consent can be given unconditionally or with conditions about the manner of the work and the persons who carry it out. A condition may also require that someone authorised be given the chance, before the works begin, to examine the monument and its site and carry out archaeological excavation. A person who fails to comply with a condition is guilty of an offence, unless they prove they took all reasonable precautions and exercised all due diligence.
Because the Act speaks of causing or permitting works as well as executing them, the duty is not confined to the person on the roof. Repair is named in the section, alongside demolition and alteration, so repairing a roof that is part of a scheduled monument sits inside the wording. The section also reaches works that result in damage. That is why a scaffold base, a skip or a ladder footing on or against a monument needs asking about before it is placed.
Wales: sections 13 and 14 of the 2023 Act
In Wales, section 14 of the 2023 Act sits beside section 13, which says works are authorised if the Welsh Ministers have granted written consent and the works are carried out in line with the consent, conditions included. Section 13 came into force on 4 November 2024. Section 14(1) says "An application for scheduled monument consent must be made to the Welsh Ministers."
In Wales, section 14(2) sets out what an application must contain:
- it must identify the area of land it relates to
- it must describe the works and the likely impact of the works on the monument
- it must carry any other information the Welsh Ministers require
For a roof job, the description is the part a roofer can help with: which covering is coming off, what goes back, how the work is carried out and where the access stands. In Wales, section 14(4) and (5) deal with minor works to remove or repair a scheduled monument or to make alterations or additions to it. The Welsh Ministers may agree with an applicant that such an application be made otherwise than in the usual way. That is an agreement to ask for, not one to assume.
In Wales, section 13(2) covers one further case. Where works were carried out without authorisation and the Welsh Ministers later grant written consent, the works are authorised from the grant of the consent. It describes what consent does after the event. It is no reason to start first.
Churchyards, chapels and monuments in the grounds
A church may have its own consent route, and a monument in its grounds is a separate matter. In England, the Church of England's faculty jurisdiction covers its churches in use. The handful of other exempt denominations, and the ones that are not exempt, are set out in the guide linked below. In Wales, the exempt buildings are Church in Wales churches, Roman Catholic and Methodist churches, Church of England faculty buildings, and Baptist chapels whose holder is one of the two named Baptist Union corporations. Our guide to church roofs, faculties and exemptions covers those routes.
In Wales, the Regulations limit that exemption to works done by a church body or for it, and a building wholly or mainly used as a residence by a minister of religion is not a religious building. Both points come from the Welsh Regulations and the Act's explanatory notes.
The monument keeps its own rule. In Wales, the explanatory notes say that "if there is a scheduled monument within the curtilage of an exempt religious building, any works to that monument will require scheduled monument consent." In England, treat a monument in a churchyard as its own question as well, and ask before anything is set down beside it.
The practical cases are ordinary ones: where the scaffold stands, where the skip goes, how materials reach the roof. Our short answer on work near a churchyard cross deals with that situation.
Defences, urgent work and what a court looks at
Section 2 of the 1979 Act, which applies in England, sets out defences. They are matters for a court to weigh. They are not permissions to start work.
- In England, section 2(7): where the works damage or destroy a monument, it is a defence to prove that all reasonable precautions were taken and all due diligence exercised to avoid or prevent damage.
- In England, section 2(8): for damage works, or flooding and tipping, it is a defence to prove the accused did not know and had no reason to believe the monument was within the area affected, or that it was a scheduled monument.
- In England, section 2(9): it is a defence that the works were urgently necessary in the interests of safety or health and that written notice of the need for them was given to the Secretary of State as soon as reasonably practicable.
A person guilty of an offence under section 2 is liable to a fine: on summary conviction, one not exceeding the statutory maximum, and on conviction on indictment, a fine.
Keep the answers in writing. An email from the council's conservation officer naming the monument and the consent route is worth more at the start of a job than a memory of a phone call.
For a storm-damaged roof on a scheduled building, section 2(9) is the provision to read, because the defence needs both the urgency and the written notice. An emergency make-safe on such a roof means keeping to temporary measures, photographing the roof before and after, and giving you a record to send with any notice.
What to ask before a scaffold goes up
Before a price is agreed on a site that may be scheduled, work through these questions with the council and, where relevant, the church or landowner:
- Is the building, or anything in its grounds, a scheduled monument? The council can say.
- If it is, who gives consent: the Secretary of State in England, or the Welsh Ministers in Wales?
- Is the building also listed or in a conservation area? Herefordshire Council says there are 64 conservation areas in the county; ask the council whether a particular house falls inside one. Being in a conservation area is a separate matter from scheduling, and so is a listing.
- Would the scaffold, the skip or the access route touch the monument?
- Has the roof, and the monument beside it, been photographed before anything is touched?
- Does the repair need temporary works, such as a tarpaulin held by weights or battens, that would bear on the monument?
We survey the roof, photograph what we find, and quote one total price in writing. Where consent is needed, the job waits for it, with the scaffold, the covering and the programme all planned around the terms it carries, and the photographs and the written description of the repair come to you to attach to the application.
Our longer guide to unauthorised works to a listed roof covers the separate listed building rules on both sides of the border.