In brief
A listed church that is redundant needs listed building consent for roof work that alters its character, on both sides of the border. English law lifts the controls only while a building is in current church use (section 60 of the 1990 Act), and the Welsh Regulations of 2024 ask whether worship is its main use. A closed chapel, or one of the Churches Conservation Trust's buildings, goes to the council.
Why current use decides whether the exemption holds
The ecclesiastical exemption belongs to the use, not to the stones. Named denominations run their own approval systems for buildings they actively use, and the law steps back for that reason. Once the use stops, so does the reason, and the building returns to the ordinary listed building controls, with the planning authority as the body you ask.
English law writes this into section 60 of the Planning (Listed Buildings and Conservation Areas) Act 1990, which lets the controls fall away only for an ecclesiastical building in current church use. The words look at use today, not at the building's history. DCMS adds that the ordinary secular controls also cover the buildings of the Churches Conservation Trust, a body that keeps redundant churches.
Welsh law puts the test in regulation 2(3)(a) of the 2024 Regulations, which count a building as a church building by its main use: worship has to be what it is chiefly used for. A church that has shut, or a chapel now serving as a store or a dwelling, fails that test, however recently the last service was held, and the council becomes the body to ask.
Where the application goes on each side
For a redundant listed church, the route is listed building consent from the local planning authority, which is the local council or, in a National Park, the Park Authority. The English legal basis is section 7 of the 1990 Act. The Welsh basis is section 88 of the Historic Environment (Wales) Act 2023, with authority granted under section 89, in force since 4 November 2024.
| Situation | England | Wales |
|---|---|---|
| Closed church or chapel | Listed building consent | Listed building consent |
| A Churches Conservation Trust building | Listed building consent | Ask the council which route applies |
| Church in worship use | Faculty, or the denomination's own scheme | The exempt body's own system |
Inside Bannau Brycheiniog, the National Park Authority acts as planning authority for any church within the Park boundary, so a redundant church there is raised with the Authority, while the council keeps building control. A scheduled monument standing in the churchyard adds a separate consent of its own, which comes from a different decision maker, so start by asking the planning team what stands where.
What the roof survey has to show
A church roof that has stood unused may have gone without maintenance for a while. A gutter blocked through several seasons, a slate slipped above the vestry or a ridge with failed bedding can each wet the timbers underneath. The application is stronger when the survey says what is wrong and how little needs to change, and the officer reads a plain account more readily than a vague one.
We begin at the skyline and work down. The checks, each one photographed, cover these points:
- the ridge line, the gable copings and the meeting with any bellcote or tower
- valleys, and any lead lining to a gutter behind a parapet
- the covering, and how each course was laid
- the roof timbers, as far as they show from inside
Photographs of every item go into the application, so the officer sees what we saw on the day, and the owner holds the same set for the building's file. Our guide to church roofs, faculties and exemptions explains the English route for a congregation that still meets, which is a different path from the one on this page, and the contrast is worth reading before you ask the council anything.
Bats, birds and a building left empty
A church that stands empty can make a good home for wildlife, so the survey looks for signs of it. Bats are fully protected, and so are the places they breed and rest in. If roof work cannot steer clear of them, the licence comes from Natural England on the English side and from Natural Resources Wales on the Welsh side.
The Wildlife and Countryside Act 1981 adds two offences. Under section 1, intentionally damaging a wild bird's nest "while that nest is in use or being built" is an offence. Bats fall under section 9(4) of the same Act, which bites on anyone who intentionally or recklessly disturbs one sheltering in a structure. Regulation 43 of the 2017 Habitats Regulations reaches damage to a resting place whatever the intent, so an empty-looking roof still gets checked.
All of this is settled before the consent is relied on. Our guide to bats in old buildings explains the licences, and our listed and heritage roofing page describes the survey that comes first. Our quote then arrives as one figure on paper.
