The Historic Environment (Wales) Act 2023 has covered roof work on a listed building in Wales since 4 November 2024. This guide sets sections 88 and 89 beside the jobs a roofer actually meets.

Horizon Roofing Hereford 9 min read

A listed house in Monmouthshire or Powys has a roof that must be kept watertight like any other, and the law that decides which repairs need approval changed recently. Section 88 of the Historic Environment (Wales) Act 2023 came into force on 4 November 2024, and it is now the starting point for anyone planning roof work on a listed building in Monmouthshire, Powys or the Bannau Brycheiniog.

We work across that border country from Hereford, and a Welsh listed roof raises a different set of questions from one a few miles east. Which Act applies, who has to ask for permission, how a re-covering is treated, and what happens to the permitted development rights a house would otherwise have. This page takes those in turn, with the wording of the Act and of the Welsh Government beside each point.

It is about Wales only. A listed building in Herefordshire or the other English counties is dealt with under a separate Act, and has its own guide. For the wider range of older-roof work we do, see our listed and heritage roofing page.

What changed on 4 November 2024

Wales now has its own consolidated law for historic buildings. The Historic Environment (Wales) Act 2023 brought listed building control, conservation areas and scheduled monuments into a single Welsh Act, and section 88 was brought into force on 4 November 2024. From that date the Act, rather than earlier law, is the place to look for the rules on works to a listed building in Wales.

For an owner or a roofer, that means guidance written before the change, or written for England, may not match what applies to a Welsh address, and the dates matter when you read anything older. Three points are worth holding on to:

  • The Act is a Welsh Act, and the decisions it sets up are made by Welsh authorities.
  • Conservation areas are designated under Part 4 of the same Act, so a house can be listed, in a conservation area, or both.
  • Exempt church buildings in use are dealt with by regulations made under the Act, in force from the same date.

The date matters in practice. The rules for a listed building before and after it are not the same document, and the owner of a Welsh house is entitled to the current one, which is why we check which text a source is quoting. We say this plainly because an owner who has read an English page on the same subject may expect rules that do not apply here. For anything that depends on how your council or the National Park Authority handles a case, ask it directly. That is the right route if your house sits inside the National Park.

Section 88: the prohibition on unauthorised works

Section 88(1) is the central rule. It says: "A person must not carry out works to which this section applies, or cause such works to be carried out, unless the works are authorised under section 89." Section 88(2)(a) names the first kind of work it applies to: "works for the alteration or extension of a listed building in any way that would affect its character as a building of special architectural or historic interest".

Read slowly, that sets a clear shape.

  1. The rule is aimed at a person who carries out the works, or who causes them to be carried out. A contractor and an owner can each fall within it.
  2. The test is whether the alteration would affect the building's character as a place of special architectural or historic interest, which is wider than whether the roof looks different from the lane.
  3. The way out is authorisation under section 89, which the Act calls authorisation of works by listed building consent.

The wording of a roof job may not settle the question for you. The Act does not mention tiles, slates, stone or ridges, and it states no area below which work is outside the test. Whether re-pointing a verge, lifting and relaying a slope or replacing a gutter bracket would affect character is a judgement for the council to make about your building.

The full text of section 88 is on the government's legislation site, and section 89 follows it there. Before we price a Welsh listed roof, we ask for the consent, or for a note from the council that none is required.

How a roof is weighed under the character test

A council deciding whether roof work would affect character looks at the whole roof as part of the house. The covering matters, but so do the lines of the slopes, the finish at the eaves and verges, the stacks and pots, any rooflights and the structure inside the roof space.

On a Welsh border house those parts tell a story. A chimney stack with a particular cap, a ridge bedded in a mortar that has weathered to the colour of the stone, an old slope with irregular courses: each can be part of what the listing protects. Replacing them with something neat and new can cost the building the very thing that made it special.

That is why a survey on a listed roof is slower than on a modern one. We record:

  • the covering, its size, thickness and the way the courses lap
  • how the ridge, hips and verges are finished and fixed
  • the stacks, flashings and valleys, and what they are made from
  • the eaves detail, with the rafter ends and how the gutter is held
  • any earlier repairs in other materials

Every item is photographed from your own roof and the pictures come to you. Those pictures, with a plain account of the intended work, make up the roof half of an application, and the written quote follows the survey as one total price.

Where the original covering has gone and a later material sits on the roof, the choice of what to lay is itself a matter for the council. One related worry is whether stone can be swapped for slate, which our answer page on stone tiles swapped for slate addresses.

Permitted development sits beside consent, not instead of it

It is easy to assume that re-roofing needs no permission at all. The Welsh Government's roof page says: "You do not normally need to apply for planning permission to re-roof your house or to insert roof lights or skylights." That is about planning permission. That sentence leaves listed building consent untouched. A listed house in Wales keeps its Class B and Class C rights and still needs consent where a job reaches its special character.

The Welsh version of Class C has conditions that deserve a look before you plan a re-cover.

Welsh permitted development points for a roof
PointWhat the Welsh rules say
MaterialsClass C.2(a): new materials must "so far as practicable match" the appearance of the existing ones
Roof lightsNot permitted development on article 1(5) land or in a World Heritage Site
Article 1(5) landNational Park, AONB and conservation area land
DormersClass B.1(g): not permitted development on article 1(5) land

A roof light in a conservation area, a National Park or a National Landscape (AONB) falls outside the Welsh permitted development rights and needs planning permission. A changed covering in a different material may fall outside Class C as well, because the appearance must match so far as practicable. Both of these sit on top of the consent question, not in place of it.

The detailed wording of the conditions, including the side-window rules, is set out in our planning guide for roof windows.

Churches, chapels and the exempt list

Some old roofs sit outside listed building consent altogether. The Listed Buildings (Exempt Religious Buildings) (Wales) Regulations 2024, made under section 156 of the 2023 Act, say which church buildings are exempt. The groups named are:

  • the Church in Wales
  • the Roman Catholic Church, through its diocesan trustees
  • the Methodist Church
  • Baptist chapels, but only where one of two named Baptist corporations owns the building or holds it in trust
  • Church of England buildings that come under the faculty system

Whether a particular chapel is held by one of those bodies is a matter for its trustees or the denomination, and we ask for that answer in writing before any quote is given. Two cautions apply. First, the exemption reaches a building whose main use is worship (regulation 2(3)(a)), so a closed or redundant chapel is outside it. Second, the explanatory notes treat a building wholly or mainly lived in by a minister of religion as not religious, so a minister's house beside a chapel needs consent in the ordinary way.

No entry on the Welsh list covers the United Reformed Church, so a listed United Reformed chapel needs consent for roof work. A Unitarian or Quaker meeting place is not named either.

Our guide to chapel and church roofs in Wales goes through the list in detail, and the instrument itself is SI 2024/927. A scheduled monument is different again: under section 14 of the 2023 Act, an application for scheduled monument consent "must be made to the Welsh Ministers".

Who to ask, and what to bring

For a Welsh listed roof the first conversation is with the local planning authority, which is the county council or, inside the National Park, the National Park Authority. Check with the National Park Authority if your house is within the Bannau Brycheiniog, because planning there is its responsibility. Ask it directly what it wants to see with an application.

Bring the same material to whoever you ask:

  • the list entry for the building, so the grade and any mention of the roof are on the table
  • our survey photographs of each slope, the ridge, the verges, the stacks and the valleys
  • a plain description of the work, naming the existing and the intended materials
  • drawings if the form or position of anything changes
  • the dates of earlier repairs, if you know them

The council may also want to know how long the roof will be open and how the interior is protected while it is. We can give you that in writing as part of the quote, based on the survey. Then be exact about the job. A request to replace six slipped slates with sound slates of the same size from the same stock is simple to judge. A request to "redo the roof" is not.

If the work has already started or finished without authorisation, read our guide to unauthorised works to a listed roof before doing anything else, because the position on both sides of the border is set out there.

If the poles go up on the public pavement or road, we arrange the licence with our scaffolder; Monmouthshire sets a fee and notice period of its own. In Powys, ask the council for its own licence terms. The quote is written as one total and states whether scaffold is in it.

Questions on consent for Welsh listed roofs

Which Act applies to a listed roof in Wales?

The Historic Environment (Wales) Act 2023. Section 88 forbids any works that would change a listed building's special character unless section 89 authorises them, and it has been in force since 4 November 2024. A Welsh address is not covered by the English Act at all.

Does permitted development let me re-roof a listed house in Wales without consent?

No. A listed house keeps its Class B and Class C rights, but a job that reaches its special character also needs listed building consent. Class C.2(a) separately asks new materials to match the existing ones so far as practicable, which a different covering may not do.

Where does a United Reformed chapel roof stand under the Welsh rules?

The 2024 Welsh regulations name the Church in Wales, Roman Catholic, Methodist, two Baptist corporations and Church of England faculty buildings. The United Reformed Church is missing from that list, so a listed chapel of that denomination goes through listed building consent like any house.