01432 610152 Get a quote Call 01432 610152

Bats and roofs

Bats in old buildings: roof work and the licences

Older roofs are full of gaps, and the law protects bats and the places they shelter. Before an old roof is stripped, the legal position on each side of the border needs settling first.

Horizon Roofing Hereford 10 min read

An old roof may not be a sealed lid. Stone and tile roofs have gaps beneath the covering, behind the ridge and under the eaves, and a roof void that has been left alone for decades can suit a bat as well as it suits a stored suitcase. The difficulty for an owner is that the bat is protected, not the roof, and a repair that is entirely routine for the house can become unlawful for the bat.

England and Wales share the offences, since the Wildlife and Countryside Act 1981 and the 2017 Habitats Regulations cover both. What changes is who issues a licence: Natural England in England, Natural Resources Wales in Wales. For a listed house there is a second set of consents on top, again different on each side.

This guide explains the offences in plain terms, how a survey fits into the work, what happens if a bat turns up midway through a job, and where birds' nests come into it. It is part of our wider listed and heritage roofing work, where older buildings get a repair matched to how they were built.

What the law actually prohibits

Two pieces of law do the work, and they are worded differently, which matters for a roofer. Under the Wildlife and Countryside Act 1981, section 9(4), a person is guilty of an offence if "intentionally or recklessly" they disturb a protected animal "while it is occupying a structure or place which it uses for shelter or protection", or obstruct access to such a place. Regulation 43 of the 2017 Regulations adds an offence of deliberate disturbance of protected wild animals, and separately bars harm to a place where such an animal breeds or rests.

The detail that catches people out is that the harm-to-a-roost limb carries no intent in its wording. It applies whether or not you knew bats were there, and an owner who strips a roof without checking gains nothing from having been unaware.

The bat offences that touch roof work
LawWhat it coversIntent needed
WCA 1981 s9(4)Disturbing a bat in its shelter; blocking access to itIntentionally or recklessly
Habitats Regulations 2017 reg 43Disturbing protected wild animalsDeliberately
Same regulationHarm to a roost or breeding placeNone in the wording

This is why the licence conversation comes before the scaffold goes up. Blocking a gap at the eaves, or sealing a hole under the ridge, can fall under the obstruction offence in the same way that lifting tiles can fall under the disturbance one.

Who licenses, and where each side of the border stands

When roof work cannot avoid affecting a bat roost, the work needs a licence, and the body that issues it depends on the address. The two links below are the issuing bodies' own pages.

  • In England, GOV.UK, in its guidance on bats, surveys and licences, says "All bat species, their breeding sites and resting places are fully protected by law" and lists "repairing or replacing a roof" among the activities affected. It goes on to say that a licence may be available from Natural England.
  • In Wales, Natural Resources Wales asks for a licence application before any work that affects a protected species on the Welsh side, and points to a species licence where bats or their roosts cannot be left undisturbed.

The border matters for Hereford work in a plain way. A house in Herefordshire is in England, so Natural England is the body. A house in Monmouthshire or Powys, including the border country under the Bannau Brycheiniog, is in Wales, so Natural Resources Wales is the body. The two bodies have their own forms, contact routes and timescales.

We are the roofer, not the licensing body, and a licence decision is never ours to promise. Before the first visit it helps to have to hand any earlier bat survey or licence paperwork for the building, a note of where droppings or a bat have been seen, and the listing details if the house is listed. None of this is required to book a survey, but each item shortens the conversation with the licensing body. Our part is to spot the risk at the survey, record the roof with photographs and tell you which of the two bodies to approach before the work is put in the diary.

What a survey looks at on an old roof

A survey for roof work on an older building covers more than the covering. It looks at the whole shell that a bat could use, and at the signs that one has. Our own survey notes where the roof could be a shelter, which is the ground for asking the licensing body for advice. Where bats are suspected, a specialist bat survey is the next step, and its findings go to the licensing body.

The places that get the closest look:

  • gaps under the ridge, where the ridge tiles meet the covering
  • the verges and the barge boards, where there is a slot between board and wall
  • the eaves, along the lower edge of the roof
  • lifted lead, soakers and flashings beside a chimney
  • the roof void itself, including the timbers, the underside of the covering and any stone on the floor

In the loft, the marks of occupation can be droppings on a timber or on the floor beneath a gap, staining around an entrance, or a bat itself. Photographs of any of these go into the survey record, and we stop there rather than move anything.

An old building has extra places of this kind. A stone-tile roof laid without underlay shows the underside of the stones directly, and a timber-framed house has the gaps where infill meets frame. Herefordshire's old stone roofs use sandstone tilestones cut from local rock, and the SPAB guidance on slate and stone roofs adds that such roofs "are predominantly double-lapped", which leaves a pattern of overlaps that a survey must inspect course by course.

Planning the work around the roost

When a survey points to bats, the order of the job changes. The licensing body's decision comes first, and the roof work follows what it permits. The order we follow is:

  1. survey the roof and photograph what we find, including any sign of occupation
  2. tell you plainly if the roof may be a roost, and name the licensing body for your address
  3. wait for the licence or the licensing body's advice before the covering is touched
  4. carry out the work to the terms given, with the roof opened by hand where that is required

That waiting is the main effect on price and programme. Licensing timescales are set by the issuing bodies, so a start date cannot be promised; a decision outside our control can move it. The written quote follows the survey, and naming a fixed start before the position is known would be guesswork.

If a bat turns up unexpectedly while work is under way, work on that section pauses while we contact the licensing body for your address, Natural England in England and Natural Resources Wales in Wales. That is the course of action that keeps you on the right side of the offences described earlier. Covering it up again, or carrying on, is not.

Our written quote gives a single total after the survey, and the cost of a bat survey and of any licence conditions sits outside it unless the quote says otherwise. Check that a quote you hold states what it leaves out.

Listed and older buildings: a second layer of consent

Some roofs with bat potential are old enough to be listed, and a listed roof carries its own consents on top. The licence for the bats does not replace consent for the building, and consent for the building does not cover the bats. Both have to be right.

Listed building consent rests on a different Act on each side:

  • In England, section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 requires consent for works "in any manner which would affect its character as a building of special architectural or historic interest, unless the works are authorised".
  • In Wales, section 88(1) of the 2023 Welsh Act says a person "must not carry out works to which this section applies" unless they are authorised, and section 89 provides for authorisation by listed building consent. Section 88 has been in force since 4 November 2024.

A listed house keeps its permitted development rights for the roof, but needs consent as well. Our guides to repairing a stone tile roof and matching materials on a period roof cover the consent side. Where the roof is also a bat roost, the covering you are allowed to use and the way it is laid may both be shaped by the licence conditions.

For a house that is not listed but stands in a conservation area, the council is the place to ask about consent. For a house inside the National Park, ask the National Park Authority. We do not advise that no consent is needed, because it is the council or the Park Authority, not us, that decides.

Birds' nests and the other protected tenants

Bats are not the only occupants of an old roof. It is an offence under section 1(1) of the Wildlife and Countryside Act 1981 for a person to harm or remove a wild bird's nest "intentionally", but only for a nest that is occupied or being built. The word intentionally matters, and so does the clause about use. A nest that birds still use, or are still making, is protected in a way that an old, empty one is not.

We do not quote nesting-season dates, because the dates that matter are the ones for the nest in front of you. For a roof with birds in the eaves, the practical approach is the same as with bats: look first, photograph what is there and leave the nest alone until its position is clear.

The same approach covers the places where birds and bats tend to share a building, such as the ridge, the eaves and the gaps under flashings and fascia boards. Where we see a nest in use, we leave that section of the roof until it is no longer in use, and plan the rest of the job around it. A fascia that looks tired may hide a nest behind it, and a roof edge that looks quiet in daylight may not be quiet at dusk, so the survey notes anything seen at the roofline rather than judging by a single glance from the ground. If you have seen birds going in and out of a gap, tell us where, because that single detail can save a day of guesswork.

The 1981 Act covers England and Wales alike, and only the body you would go to about bats differs. For birds, the position is set by the Act, so there is no licence application to wait for in the same sense.

Bats and roof work: your questions

Can I seal the gaps first so bats cannot get in?

No. Under section 9(4) of the Wildlife and Countryside Act 1981, obstructing access to a place a bat uses for shelter is an offence where it is done intentionally or recklessly. Closing a gap ahead of roof work could fall within that. Speak to Natural England in England or Natural Resources Wales in Wales before closing anything.

Who do I contact if I find a bat in the loft?

Contact the licensing body for your address: Natural England if the house is in England, Natural Resources Wales if it is in Wales. Do not move the bat or the timbers around it. Tell us as well, and we will keep roof work away from that part of the building until the position is clear.

Does my listed house need a bat licence as well as consent?

If the work could affect a roost, yes, they are separate approvals. Listed building consent covers the building, under the 1990 Act in England and under the 2023 Welsh Act in Wales. The licence covers the bats. Having one does not replace the other, so both should be in hand before the roof is opened.

Get your free roof quote

Tell us about the roof and we will arrange a survey.

10-year workmanship guarantee, in writing