In brief
No. The Listed Buildings (Exempt Religious Buildings) (Wales) Regulations 2024 came into force on 4 November 2024. Regulation 2(1) names five kinds of church building, and that list leaves out the United Reformed Church. A listed URC chapel in Wales therefore sits under the Historic Environment (Wales) Act 2023. Before anything starts, roof work that alters the chapel's character needs listed building consent.
What the 2024 Regulations actually name
An exempt religious building is one where the normal listed building control gives way to a church body's own approval system. In Wales, the list of those buildings is short, and it is written into regulation 2(1) of the 2024 Regulations. They were made under section 156 of the 2023 Act, and regulation 3 revokes the 2018 order that went before them.
The five kinds of church building named in regulation 2(1) are:
- Church in Wales buildings vested in its Representative Body, or in another representative body of that church
- Roman Catholic buildings, held on trust through a diocese
- Methodist Church buildings, whether it owns them or they are held on its behalf
- Baptist chapels held by either of two corporations, the Baptist Union Corporation Limited and, separately, the Welsh Baptist Union Corporation Limited
- Church of England buildings that fall within faculty jurisdiction
Nothing in the list refers to the United Reformed Church, to Unitarians, to Quakers or to independent chapels. A URC congregation worshipping in a Radnorshire or Monmouthshire chapel is therefore in the same position as any other owner of a listed building, and the council or, inside the Park, the National Park Authority decides.
What a listed URC chapel needs before roof work
Section 88 of the 2023 Act forbids works to a listed building, and forbids causing them, unless they are authorised under section 89, which is listed building consent. Section 88(2)(a) covers works of alteration or extension "in any way that would affect its character as a building of special architectural or historic interest". Section 88 has been in force since 4 November 2024.
For a chapel roof, the character question turns on the building. Stripping and re-covering a slope is a different matter from refixing three slates on the same slope, and a change of material is different again. The council's conservation team can say where the line falls for your chapel. Bring photographs of the roof and a note of the covering, ridge and lead you plan to keep or replace, because a specific proposal gets a specific reply. Keep any written reply alongside the roof photographs, since it shows what was agreed and when.
Inside Bannau Brycheiniog, the National Park Authority is the body to check with. Our guide to who gives listed building consent in Wales names the people to approach first.
Closed chapels, shared buildings and scheduled monuments
Even where a denomination is named, the exemption holds only while the building's main use is as a place of worship, and only for work done for the church body or by it. A chapel that has closed, or been sold, has no such cover. A URC chapel never had it to lose, because the denomination is not named.
A few situations call for an early word with the council:
- a chapel shared with another congregation, where the owner may be a different body
- a chapel converted into a home or a hall, which no longer serves for worship
- a vestry, schoolroom or minister's house attached to the chapel, which may have its own list entry
- a scheduled monument in the grounds, such as a cross or an earlier ruin
Scheduled monument consent is a separate matter. Under section 14(1) of the 2023 Act, an application for it "must be made to the Welsh Ministers". A house beside a chapel has a page of its own: the minister's house next to a chapel in Wales.
Getting the chapel roof surveyed
A chapel roof can be a long, steep run of slate over open timbers, with a bellcote, a gable cross or a lead-lined valley beside the porch. We look first at the ridge and the verges, then the valley and the lead, and photograph each defect from the roof so the council sees what we saw. Where the chapel carries stone tilestones in place of slate, SPAB advises that any claim of stone being unavailable, or slow to arrive, "should always be checked with the quarries", and we put that question to the quarry before proposing a different stone.
That survey does three jobs. It shows what has failed, it shows what can stay, and it gives the conservation team something concrete to judge. Afterwards the price reaches you as one written total, and the total should say whether VAT is included.
If the chapel is not listed, listed building consent does not arise, but other approvals can. The Welsh Government says that in most situations re-roofing "will need Building Regulations approval", so ask the council's building control service or a registered building control approver before the job is booked. Our listed and heritage roofing work follows the covering, fixings and detail the chapel was built with, and says plainly when a repair beats a replacement.
